BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 10, 2026

Site work and new construction of a pre-engineered storage facility in Sheboygan, Wisconsin. Completed plans call for the construction of a 26,400-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Request for Proposal for the design of a Storage Building in the City of Sheboygan and the associated site design. SCOPE OF SERVICES Scope of services include, but are not limited to, the following items. It is the Consultants responsibility to determine if any additional work is required to prepare the plans and specifications required to successfully bid and construct the structure. Project Management Utility and Agency Coordination Prepare Documents for Notice of Intent to DNR (City will submit application) Obtain applicable permits from City including a plumbing permit for sewer connection, building permit, and an architecture review. Obtain any State building permits required. Prepare plans and specifications suitable for construction of the pre-engineered steel building. The City of Sheboygan will bid the plans using QuestCDN. Plans and specifications anticipated to include the following: Structure to be 120 wide by 220 long by 21 tall Reinforced concrete footings and frost wall building foundation Minimum 6 thick reinforced concrete building slab Cast-in-place concrete trench drain with heavy-duty cast iron grate and one manhole with sediment basin. Design drain to connect to existing City of Sheboygan sanitary sewer system. 6 high split face insulated CMU block on three walls of structure Four 6 diameter concrete filled steel guard posts with HDPE bollard cover at eachoverhead door (total 16) Four insulated hollow metal personnel doors with hardware Four 16x16 insulated sectional overhead doors with operators, three button control stations, and safety photo eyes Building will have clear span columns for a space that is entirely open. A minimum 18 tall clear height shall be maintained at all points throughout the building. 26-gage prefinished metal wall panels and 24-gage standing seam metal roof panels. o Electrical for the building including cabinet and panels, exterior wall pack lighting, interior lighting, convenience receptacles, emergency egress and exit lighting and wiring of equipment specific to the building. Insulation and Heating: Building shall be insulated. Include heating within the Question Deadline 06/15/2026 All questions regarding this RFP shall be submitted electronically to: City of Sheboygan Department of Public Works Engineering Division ATTN: Kevin Jump, PE, City Engineer Email: kevin.jump@sheboyganwi.gov The building site is located between South 22nd Street and South 21st Street north of Maryland Avenue.

GC Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$2,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
42
Bidding Soon
1,476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 17, 2026

Project location map

S 21st St, Sheboygan, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.