Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work and new construction of a playground / park / athletic field in Sublimity, Oregon. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
The Oregon Parks and Recreation Department (OPRD) is seeking bids from qualified framing contractors for the interior rough framing construction in the North Gateway Visitor Center at Silver Falls State Park OregonBuys #S-63400-00017057 Deadline for Inquiries (Protests and Requests for Clarification) June 10th, 2026. 5:00pm: Bidders shall address ALL INQUIRIES related to this Solicitation to Bryant Hayes EM: bryant.hayes@oprd.oregon.gov PH: 503-779-5566 Single Point of Contact ("SPC"): Name: Bryant Hayes, Senior Procurement Specialist Email: Bryant.hayes@oprd.oregon.gov Phone: 503-779-5566 Substantial Completion: October 1, 2027 Final Completion Date: November, 1, 2027 1. Rough Framing a. Demo / reframe door rough openings as noted in the drawings (keynote 5 on A3.1, A2.2, A2.4, A2.5) b. Provide demo of existing walls, shoring, and new rough framing at new footings at Stair S2 and Storage 002. c. Provide shoring for concrete demo in basement. d. Provide floor demo and rough framing for elevator shaft. e. Provide demo & framing at Lobby 101 and at Door 101A. f. Cafe a) Demo existing framing as noted. b) Frame new cafe and adjacent openings. g. Remove existing floor sheathing and wing walls at Door 101A. Provide new 1-1/8" plywood sheathing overlay for the entire floor area for Lobby 101 to flush with floor sheathing at Dining 102. Provide framing at door 101A and ceiling/soffit above. h. Frame for attic access hatch in Restroom 209. i. Fill/patch all holes in floor sheathing as described in keynote 1 on A2.4, A2.5. Provide additional fasteners in existing floor sheathing and new floor sheathing as described in keynote 2 on A2.4, A2.5 j. Furnish and install trim over existing beam (see note on 1/A3.1 and 11/A8.4. k. Demo section of south wall at Office 204, area sufficient to relocate owner furnish desk (+-6'- 6" x +-10'-6") from Main Lobby 106 to Office 204. Reframe opening after desk is moved. l. Main entry east wall: Sheet with 3/4 " plywood to provide plumb and level surface for finishes. m. Framing for plumbing chase at Copy Room 202. n. Stair 1 / Dining 102 north wall. Sheet with 3/4 " plywood to provide plumb and level surface for finishes. o. Clerestory above Dining 102: Fur framing per note on 6/A8.1. p. Clerestory above Dining 102: Remove 2x6 studs above existing GLB per note on 6/A8.1. q. Dining 102 South Wall: Sheet with 3/4 " plywood to provide plumb and level surface for finishes. r. Remove section of 2x12 rafter and all interior plywood on wall above Dining 102/Office 208 to allow for installation of batt insulation (insulation to be provided and installed by others). s. Add plywood sheathing to interior side of perimeter GLBs in Lobby 101 to provide plumb and level surface for interior wall finishes. t. Lobby 101: Provide 2x6 furring at ceiling per note on 1/A3.2. u. Coordinate all plywood sheathing with rough mechanical, electrical, and plumbing. v. Provide infill framing at fireplace above opening. 2. Main Entry Vestibule a) Include waterproofing b) Include Type 'X' sheathing c) Windows and flashing (Windows are OF/CI) d) Siding and trim are NOT included. To be installed under separate contract. 3. Steel Installation a. Install owner furnished HSS columns in the basement. 4. Exterior Door Frames and Temporary Doors a. Install owner-furnished exterior door frames. Furnish and install temporary exterior doors. Doors 101, 102, 105, 106, 112, 113, 115, S-2a. 5. Submittals & QA/QC a) Review existing conditions prior to installation. Document and report inconsistencies to the Owner and the design team. b) Coordinate with other trades and contractors on site during construction.
Sub-Bidding
Playgrounds / Parks / Athletic Fields
$1,500,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2026
July 6, 2026
20024 Silver Falls Hwy SE, Sublimity, OR
Related To This Project
Sublimity, OR
Bid Date: Apr 30 2025
Sublimity, OR
--
Sublimity, OR
Bid Date: Feb 22 2024
Sublimity, OR
Bid Date: Jan 09 2024
Sublimity, OR
Bid Date: Jan 18 2022
Sublimity, OR
Bid Date: May 16 2023
Sublimity, OR
Bid Date: Aug 11 2022
Sublimity, OR
Bid Date: Dec 20 2022
Sublimity, OR
Bid Date: Oct 27 2022
Sublimity, OR
Bid Date: Nov 17 2022
Depoe Bay, OR
Bid Date: Jul 03 2026
Portland, OR
Bid Date: Jun 04 2026
Eugene, OR
Bid Date: Jun 25 2026
Silverton, OR
Bid Date: Jun 16 2026
Eugene, OR
Bid Date: Jun 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
