Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 8, 2026 at 8:00 PM
Updated July 7, 2026
Demolition and site work for a bridge / tunnel in Middlesex, Vermont. Completed plans call for the demolition of a bridge / tunnel.
The project consists of two stream crossing replacements on Lower Sunny Brook Road. Each crossing currently has side by side 60-inch CMP culverts. The proposed work includes installing a temporary roadway crossing (either upstream or downstream of the main crossing depending on the site), removing the existing CMPs, and installing an 18-foot by 6-foot concrete box culvert with headwalls and wing walls at each inlet and outlet. To request the construction drawings prepared by Fitzgerald Environmental Associates, contact Jordan Duffy at jordan@feavt.com. Interested contractors must attend a mandatory pre-bid site visit at 53 Lower Sunny Brook Road in Middlesex. Question Deadline 06/10/2026 questions about the scope of work should be emailed to Jordan Duffy at jordan@feavt.com . This project consists of the replacement of two (2) culverts on Lower Sunny Brook Rd (Lower Sunny Brook Rd (North), and Lower Sunny Brook Rd (South)). The two sites are being bid together. Bidders must provide bids to support replacement of both structures in sequence. Flooding in 2024 damaged the culverts and roadway in two locations along Lower Sunny Brook Rd. Following the flood, the two damaged crossings were repaired utilizing two side by side 60" CMP culverts at each site. Both crossing locations have waste block headwalls at the inlet and outlet and are experiencing streambed material deposition and clogging based on how undersized they are. There is approximately 800 feet between the two sites. The project will consist of installation of a temporary roadway crossing (up or downstream of the main crossing depending on the site), removal of the existing CMPs, and installation of an 18' x 6' concrete box culvert with headwalls and wing walls at each inlet and outlet. In addition, the project proposes bank stabilization surrounding the proposed culvert and minor channel grading to achieve the proposed slopes following the removal of the temporary roadway. The Town has ordered the two (2) concrete box culverts and will pay for manufacturing and delivery of the structures. It shall be the responsibility of the contractor to provide a crane for the removal of the pre-cast from the delivery truck and the proper installation of the culverts. completion date of October 1, 2026
Post-Bid
Bridges / Tunnels
$500,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2026
August 1, 2026
53 Lower Sunnybrook Rd, Middlesex, VT
Related To This Project
Middlesex, VT
--
Middlesex, VT
Bid Date: Oct 07 2026
Middlesex, VT
--
Middlesex, VT
Bid Date: Jun 26 2026
Middlesex, VT
Bid Date: Jun 09 2026
Middlesex, VT
--
Middlesex, VT
Bid Date: Oct 23 2025
Middlesex, VT
--
Middlesex, VT
--
Middlesex, VT
Bid Date: Dec 16 2024
Middlesex, VT
Bid Date: Dec 16 2024
Middlesex, VT
Bid Date: Dec 16 2024
Middlesex, VT
Bid Date: Dec 16 2024
Middlesex, VT
Bid Date: Dec 16 2024
Middlesex, VT
Bid Date: Dec 16 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed