Published June 8, 2026 at 8:00 PM

Updated June 10, 2026

Demolition and site work for a bridge / tunnel in Middlesex, Vermont. Completed plans call for the demolition of a bridge / tunnel.

The project consists of two stream crossing replacements on Lower Sunny Brook Road. Each crossing currently has side by side 60-inch CMP culverts. The proposed work includes installing a temporary roadway crossing (either upstream or downstream of the main crossing depending on the site), removing the existing CMPs, and installing an 18-foot by 6-foot concrete box culvert with headwalls and wing walls at each inlet and outlet. To request the construction drawings prepared by Fitzgerald Environmental Associates, contact Jordan Duffy at jordan@feavt.com. Interested contractors must attend a mandatory pre-bid site visit at 53 Lower Sunny Brook Road in Middlesex. Question Deadline 06/10/2026 questions about the scope of work should be emailed to Jordan Duffy at jordan@feavt.com . This project consists of the replacement of two (2) culverts on Lower Sunny Brook Rd (Lower Sunny Brook Rd (North), and Lower Sunny Brook Rd (South)). The two sites are being bid together. Bidders must provide bids to support replacement of both structures in sequence. Flooding in 2024 damaged the culverts and roadway in two locations along Lower Sunny Brook Rd. Following the flood, the two damaged crossings were repaired utilizing two side by side 60" CMP culverts at each site. Both crossing locations have waste block headwalls at the inlet and outlet and are experiencing streambed material deposition and clogging based on how undersized they are. There is approximately 800 feet between the two sites. The project will consist of installation of a temporary roadway crossing (up or downstream of the main crossing depending on the site), removal of the existing CMPs, and installation of an 18' x 6' concrete box culvert with headwalls and wing walls at each inlet and outlet. In addition, the project proposes bank stabilization surrounding the proposed culvert and minor channel grading to achieve the proposed slopes following the removal of the temporary roadway. The Town has ordered the two (2) concrete box culverts and will pay for manufacturing and delivery of the structures. It shall be the responsibility of the contractor to provide a crane for the removal of the pre-cast from the delivery truck and the proper installation of the culverts. completion date of October 1, 2026

GC Bidding

Bridges / Tunnels

$500,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
77
Bidding Soon
1,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2026

August 1, 2026

Project location map

53 Lower Sunnybrook Rd, Middlesex, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.