BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a bridge / tunnel in Flat Rock, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge rehabilitation including structural steel repairs, heat straightening and diaphragm replacement and partial painting on I-75 at Gibraltar Road, Wayne County. 0% Sbp Participation Required Net classification required for this project is 525 N9-1H MIDOT - 2607 002 - Bridge Rehabilitation Including Structural Steel Repairs, Heat Straightening and Diaphragm Replacement and Partial Painting on I-75 at Gibraltar Road

GC Bidding

Bridges / Tunnels

$525,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
227
Bidding Soon
3,271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

August 10, 2026

Project location map

Gibraltar Rd, Flat Rock, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.