Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 28, 2026 at 8:00 PM
Updated August 2, 2026
Site work, new construction and renovation of a water / sewer project in Overland Park, Kansas. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
The work includes furnishing the labor, materials, equipment, and services for construction of the new process area MB-17 Sodium Hypochlorite Storage and improvements in several existing buildings and site work (yard piping, yard electrical, paving and grading, erosion control, and general restoration). The specific buildings and improvements are as follows: - MB-2 Solids Processing Building: replacement of grit classifiers and conveyors, demolition of an existing belt filter press, and structural beam and elevated slab repairs. - MB-3 Gravity Thickener Building and Fermenter: replacement of a motor control center and various process valves. - MB-7 Administration Building: installation of a new natural gas powered standby generator and automatic transfer switch. - MB-8 Settled Sewage Pump Station: primary sludge pump modifications and replacement of primary scum pumps, settled sewage pumps, and sidestream control valves. - MB-10 Sodium Hypochlorite Building: demolition of existing sodium hypochlorite storage tanks, piping, and pumps. - MB-11 UV Disinfection Building: relocation of an existing flow meter on the plant effluent water pumping system. - MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building: replacement of primary sludge pumps, odor control fans, building make-up air unit, and the electrical room air conditioning unit. - MB-17 Sodium Hypochlorite Storage: construction of new sodium hypochlorite storage tanks and fill stations, an access roadway, and a pre-engineered fiberglass reinforced building. New excess flow chemical metering pumps are to be installed in the building along with the relocated plant effluent water chemical metering pump skid. Question Deadline 07/06/2026 at 2:00 PM CT All questions and bids are to be submitted through online
GC Bidding
Water / Sewer
$6,000,000.00
Public - County
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2026
October 2, 2026
11230 Mastin St, Overland Park, KS
Related To This Project
Overland Park, KS
Bid Date: Jun 30 2026
Overland Park, KS
Bid Date: Jun 30 2026
Overland Park, KS
Bid Date: Jun 30 2026
Overland Park, KS
Bid Date: Jun 23 2026
Overland Park, KS
--
Overland Park, KS
--
Overland Park, KS
--
Overland Park, KS
--
Overland Park, KS
Bid Date: Jun 19 2026
Overland Park, KS
Bid Date: Jun 23 2026
Overland Park, KS
Bid Date: Jun 19 2026
Overland Park, KS
--
Overland Park, KS
--
Overland Park, KS
Bid Date: Jun 10 2026
Overland Park, KS
Bid Date: Jun 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
