Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2026 at 8:00 PM

Updated July 20, 2026

Site work for a water / sewer project in Ashland, Wisconsin. Completed plans call for site work for a water / sewer project.

Questions regarding this project can be directed to Philip Livingston, 715-685-7878 or WaterSewerSupvr@badriver-nsn.gov Any or all bids may be rejected when in the best interest of the Bad River Tribe. The Project has an expected substantial completion date of July 31, 2027 and a final completion date of September 30, 2027. Clear and grub project site (approximately 130' by 170') Connect new water storage structure to existing water distribution system Construct 60'x60' chain link security perimeter fencing around new tower location. Provide gravel access drive and parking to new water storage structure. Provide new water storage structure with supervisory control. Final grading and site restoration of all locations disturbed by construction activities Complete demolition and removal of existing water storage structures: One (1) 40,000- gallon single pedestal elevated water storage tank. One (1) 75,000 - gallon single pedestal elevated water storage tank. Final grading and site restoration of all locations disturbed by demolition activities. Contact information and submittal procedures for such questions are A. Brian Breuer, P.E.; Indian Health Service; 129 North Brown St; Rhinelander, WI 54501; brian.breuer@ihs.gov; 715-365-5103 nterpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$2,500,000.00

Public - Federal

Site Work

16

21

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

July 17, 2026

Project location map

US-2, Ashland, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed