BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 23, 2026 at 8:00 PM

Updated July 8, 2026

Site work and renovation of a municipal facility in Parker, Arizona. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Metal roof replacement and exterior doors replacement services at the FDP facility. Question Deadline 06/30/2026 at 5:00 PM MT Please submit all inquiries to all Parties Listed: Stephen Eddy / Stacey Amador / Jesse Garza Contact Email: Stephen.Eddy@crit-nsn.gov Alternative Rep: Stacey.Amador@crit-nsn.gov Secondary Rep: Jesse.Garza@crit-nsn.gov RoofRepair Services The selected contractor shall: o Inspect the existing roofsystem. o Remove and dispose ofthe existing roofing system and all related roofing materials. o Furnish and install a complete new standing seam metal roofing system, including all necessary flashing, trim, underlayment, fasteners, sealants, and waterproofing components. o Corrugated metal roofing systems will not be accepted. o The standing seam metal roofing system shall be commercial-grade and installed in accordance with manufacturer specifications and all applicable building codes. o Ensure the new roofing system is fully weather-tight and capable of withstanding local environmental and weather conditions. o Include all labor, equipment, materials, lifts, permits, and related items necessary for a complete turnkey installation. o Dispose of all debris and maintain a clean and safe worksite throughout the duration ofthe project Exterior Door(s) Replacement The selected contractor shall: o Remove existing exterior door(s) and frames. o Furnish and install new exterior-grade door(s) Must be ADA accessible o Install all required hardware, locks, thresholds, and weather stripping. o Ensure proper fit, security, and weather sealing. o Dispose ofremoved materials and debris. 3. Project Requirements Contractors submitting proposals must provide the following: o Proof of current contractor licensing. o Proof of general liability insurance and bonding. o Compliance with all applicable local, tribal, state, and federal regulations. o OSHA-compliant safety procedures. o Warranty information for materials and workmanship. o Proposed project timeline including milestones and estimated completion date.

GC Bidding

Municipal

$1,500,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
49
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.