Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2026 at 8:00 PM

Updated August 11, 2026

Site work and paving for a sidewalk / parking lot in Wray, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of August 05, 2026, the project was awarded to Chamberlain Concrete but no awarded amount is not available. Reference Number 0000427938 The City of Wray is soliciting sealed bids from qualified firms to complete site grading as well as curb and gutter, sidewalk, and retaining wall installations Question Deadline 06/24/2026 at 5:00 PM MT Questions are submitted online Yes SCOPE OF WORK All proposals shall include labor, materials, equipment, and disposal of construction debris. City of Wray intends to retain materials. A. Site Grading and Earthwork 1. Strip Top Soil to Stockpile 2. Surface to Surface Earthwork Cut to Fill 3. Surface to Surface Earthwork Fill from hardscape import B. Concrete Work 1. CDOT M-609-1, Type 2, Section IIB (6-inch barrier--2 ft gutter) Curb and gutter 2. Sidewalk 3. 2' Pan 4. ADA Ramps 5. Asphalt Paving 6. Concrete Paving (Handicap Stall/Snow Removal Areas) 7. Retaining Wall C. Site cleanup 1. Contractor to provide general cleanup of work site upon completion

Award

$100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
2
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2026

July 15, 2026

Project location map

324 W 7th St, Wray, CO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed