Site work for a road / highway in Wray, Colorado. Completed plans call for site work for a road / highway.

Reference Number 0000400823 Bid Intent Not Available The City of Wray (Wray) has scheduled the line rebuild of approximately 1.8-miles of Wray's East Feeder. The line begins at the intersection of 6th Street and the alley between Blake Street and Adams Street and ends at the intersection of Blake Street and County Road 33.6. The project involves the following: wood poles, distribution overhead, distribution underground, and removal of existing facilities. Energized distribution work is required as necessary. Additional contractor responsibilities include but are not limited to coordination of site access, private property access permission, coordination of planned distribution outages, coordination of utility locates, and damage repair. Wray will administer the construction contract and therefore be referred to as "Owner" in the construction contract documents. Wray will process contractor invoices and require invoicing per bid units. The mandatory pre-construction meeting will be conducted prior to commencing construction. Construction is scheduled to commence upon contractor availability and complete April 30, 2026. The materials for the project are Owner furnished, therefore bids shall include the labor and equipment necessary for construction. Material will be available for pickup at Wray's warehouse located at 150 Ash Street, Wray, CO 80758. The contractor is responsible for material after checkout and procuring a secure material staging location. The scope of work and instructions to bidders are not available in the provided text. The information is insufficient to fulfill the request. The project will consist of furnishing labor and equipment, for the construction of the Blake St Distribution Line Upgrade. Construction is to commence upon contractor availability and be completed by April 30, 2026. Question Deadline 10/21/2025 at 5:00 PM MT Questions are submitted online Yes, Questions regarding the bid documents shall be submitted via online. Based upon questions received an Addendum may be issued to prospective bidders. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 10 % - Payment Bond 100 % The successful bidder will be required to furnish a satisfactory Performance Bond with sureties listed by the United States Treasury Department as Acceptable Sureties, in a penal sum not less than the total contract price. The Owner will award the contract to the responsible bidder submitting the lowest and best proposal or, at its sole discretion, may reject any or all proposals.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Site Work

19

11

4

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
6
Bidding Soon
68
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

December 4, 2025

Project location map

Multiple Locations, Wray, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.