Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 30, 2026

Site work and paving for a road / highway in Sharpsville, Pennsylvania. Completed plans call for site work for a road / highway.

Grind existing surface to depth of 6". After grinding, reshape the roadway to a 2% slope. The surface will then be compacted with a 10 ton sheeps foot roller and a 10 ton steel drum roller to non-movement (Grinding and re-shaping will be done at a 18' width). Once the surface is approved by the Township, furnish and apply an Asphalt Surface Treatment, Special, consisting of MC-70, #67 Aggregate, CRS-2 and AASHTO #8 Aggregate at a finished width of 18'. All materials are to be PennDOT Approved. Grind, shape, and compact the existing roadway to a depth of 6 inches for 13,722 square yards. Apply asphalt surface treatment, special (MC-70) for 23,722 square yards. Liquidated damages apply at the rate of $975.00 per calendar day. Proposals must be submitted on forms provided by the municipality. The bid must be accompanied by a certified check or bid bond in the amount of 10% of the bid, made payable to the municipality. A performance bond or certified check in the amount of 100% of the contract shall be provided by the successful bidder within 20 days after the contract is awarded. The municipality reserves the right to reject any or all proposals.

Award

$48,750.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
167
Bidding Soon
2,797
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2026

August 6, 2026

Project location map

Multiple Locations, Sharpsville, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed