BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2026 at 8:00 PM

Updated July 8, 2026

Site work and paving for a mixed-use development in Fairbanks, Alaska. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Construct improvements on the grounds of and near the Morris Thompson Cultural and Visitor Center and the Lavery Transportation Center parking garage . Project includes ADA improvements, utilities, and roadside hardware. Morris Thompson Cultural and Visitor Center: Improvements also include the addition of dual bike lockers, installing a rectangular rapid flash beacon, constructing a pedestrian pathway between the bus stop and parking lot, and replacing and upgrading the display panel within the existing digital welcome sign. Lavery Transportation Center parking garage: Improvements include restriping and resigning the parking garage, installation of wayfinding signs, enhancement of bicycle parking area, installation of a transit notification system for pedestrians waiting inside, and several building enhancements including replacement of the building's awning and installation of a new illuminated sign. Project also includes public outreach campaign to promote the use of the parking garage. Location - Northern Region, Fairbanks Engineer's Estimate Range: Between $1,000,000 and $2,500,000 As of June 22, 2026, the project is in Conceptual status. Anticipated letting Date is December 2026. AKDOT - Morris Thompson Center & Lavery Transp. Enhancement (CMAQ/CRP) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$2,500,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
55
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.