BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 29, 2026

Site work and new construction of a pre-engineered storage facility in Rock Valley, Iowa. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project consists of construction of a new Truck shed, office/shop, garbage/cold storage, salt shed, and commodity shed on a green site. Work includes sitework, utilities, concrete, masonry, wood framed buildings, PEMB, exterior finishes, interior finishes, mechanical, electrical and plumbing. Last Request for Substitution Due: 7 days prior to due date of bids. Prime Contractors can obtain one (1 ) set of printed bidding documents, and Sub-Contractors can obtain one (1 ) set of printed bidding documents from Beeline and Blue , 2507 Ingersoll Ave , Des Moines , IA 50312. Phone: 515-244-1611 for a plan deposit of $ 150 per set. Deposit will be refunced to bidders upon return of their complete set(s) of Bidding Documents, including any Addenda, properly bound and in good condition to FEH DESIGN within 14 calendar days after opening bids. Cash deposits will not be accepted. MBI plan deposit cards are also an acceptable method for deposit for documents. When shipping/postage is required, there will be a $20 non-refundable fee for each set of Bid Documents shipped

Post-Bid

$12,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
35
Bidding Soon
536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

March 1, 2027

Project location map

2673 Summit St, Rock Valley, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.