BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2026 at 8:00 PM

Updated July 8, 2026

Site work and paving for a mixed-use development in Shawnee, Kansas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

In November 2023 voters approved the renewal of a 3/8 cent sales tax. One-third of this sales tax is designated for the Street Improvement Program (SIP). This program is dedicated to upgrading and improving older streets with curbs, sidewalks, drainage, lighting. A citizen task force was put together to rank streets based on 7 distinct criteria. The eligible streets are re-evaluated periodically. Eligible streets are normally ditch section streets that lack sidewalks, street lighting, and proper drainage facilities. The improvements normally involve complete removal and replacement of the existing street to include grading, widening, curb, sidewalk/ADA ramps, storm drainage facilities, pavement markings, and LED streetlight luminaires. The SIP projects for 2026-2035 were approved in December 2024 by the Governing Body. The fifth project on the approved list is Switzer from 67th Street to North Cul-De-Sac. Design will commence in 2029 with construction to begin in 2030. The improvements involve complete removal and replacement of the existing street to include grading, widening, curb, sidewalk/ADA ramps, storm drainage facilities, pavement markings, and LED streetlight luminaires. Switzer does not qualify for CDBG or CARS funding, so all funding will be provided through the SIP The project is included in the City's 2026-2035 Capital Improvement Program (CIP). As of June 29, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

$2,366,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
10
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.