Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2026 at 8:00 PM
Updated August 13, 2026
Renovation of a fitness / recreation center in Burnaby, British Columbia. Completed plans call for the renovation of a 35,000-square-foot fitness / recreation center.
The project involves providing Construction Management services for the SFU Burnaby Lorne Davies Complex (LDC) Facade Replacement, Project No. 309453CM. The LDC was constructed in 1965 and features a rectilinear form with vertical exterior columns, Kalwall translucent fiberglass sandwich panels, aluminum-framed clerestory glazing, and clear glazed storefront assemblies. The existing facade system, installed in 1965 and 1973, has significantly exceeded its 50-year service life and is actively failing, with issues such as condensation, air leakage, water ingress, deterioration of steel and concrete elements, organic growth, and concrete spalling. Building Enclosure Condition Assessments conducted in 2013 and 2021 concluded the facade has reached the end of its useful service life. The scope of work includes design and constructability reviews, facilitating trade input, market analysis of suppliers, multiphase schedule analysis, full removal of the Kalwall panel system, clerestory and storefront glazing, and storefront door assemblies across approximately 35,000 sf (levels 100-400), hazardous materials abatement (including asbestos-containing caulking), and disposal in accordance with regulations. The project includes supply and installation of a new high-performance curtain wall system that maintains the facade's character-defining elements. The Construction Manager will plan, coordinate, and execute the replacement of the building envelope, provide strategic input on construction feasibility, scheduling, cost management, and subcontractor selection, and coordinate closely with the architect, SFU Facilities and Project Management, and all specialty consultants. The estimated construction budget is $14.5M excluding GST, with incremental disbursement. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
$14,500,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2026
November 1, 2026
8888 University Dr, Burnaby, BC
Related To This Project
Burnaby, BC
--
Burnaby, BC
Bid Date: Aug 04 2026
Burnaby, BC
Bid Date: Jul 31 2026
Burnaby, BC
Bid Date: Aug 10 2026
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
--
Burnaby, BC
Bid Date: Aug 20 2026
Burnaby, BC
--
Burnaby, BC
Bid Date: Jul 22 2026
Burnaby, BC
Bid Date: Jul 21 2026
Burnaby, BC
--
Burnaby, BC
Bid Date: Jul 07 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
