Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Site work and renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a parking garage.
Parking garage repairs including masonry, painting/decorating, plumbing, and sprinklerfitting work. Bonds: 10% Bid Bond, Certified Check required. Set-asides: 25% SBE. RFI Deadline: July 20, 2026 at 12:00PM CDT Project Area: Exterior Loading Dock Approach, Exterior Plaza Level, Interior Lower Level Parking, and Interior Upper Level Parking The following work described herein is associated with the demolition, removal, and repair of damaged exterior paving and interior structural components at the exterior plaza level and interior parking garage of the Police Administration Building (PAB). This includes improvements to stormwater drainage at the exterior loading dock approach and elimination of water infiltration at the exterior plaza level . The following is a summary of work proposed for each discipline. Please note the following work is not limited to the items listed below. The entire scope of work should be located within the project drawings and manual. 1 . Civil Alterations a. Existing site demolition and removal b. Site regrading, layout, and preparation C. Site utility and erosion control Structural Alterations a. Existing structural demolition and removal b. Structural preparation and repairs Architectural Alterations a. Existing paving demolition and removal b. Paving preparation and replacement C. Precast concrete and coping repairs or replacement d. Painting, traffic coating, and restriping of parking garage Plumbing Alterations a. Existing plumbing demolition and removal b. Plumbing preparation and replacement Electrical Alterations a. See Part 4, Work by Others, regarding Electrical b. Remove and reinstall or reroute existing conduit, conductors, and light fixtures as required for structural repairs. C. Remove drip guard over existing busway and reinstall after structural repairs have been completed.
GC Bidding
$1,500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
749 W State St, Milwaukee, WI
Related To This Project
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
