BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2026 at 8:00 PM

Updated July 20, 2026

Demolition, site work, new construction and renovation of a water / sewer project in Charlottetown, Newfoundland. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 07/03/2026 All enquiries are to be submitted in writing to the Contracting Authority at DFO.tenders-soumissions.MPO@dfo-mpo.gc.ca Enquiries are to be made in writing and should be received no less than seven (7) working days prior to the closing date to allow sufficient time to respond. The purpose of this project is to replace existing floating dock infrastructure at the Charlottetown harbour facility in Charlottetown , Labrador. The Work includes , but is not limited to, the following 1. Provide all labour, materials , equipment , supervision , and incidentals required to complete the Work. 2. Remove and dispose of four (4) existing floating docks , including associated mooring systems and two (2) concrete anchor blocks . 3. Remove and dispose of two (2) existing timber gangways. 4. Remove and dispose of timber decking and related components on existing headblock cribs , including wheelguards, blocking, and connection hardware, and salvage select items for reuse. 5. Supply, construct, and install four (4) new floating docks complete with mooring systems, connection hardware, and anchor systems. 6. Supply, construct, and install two (2) new timber gangways complete with all required connections. 7. Install new treated timber decking, wheelguards, and blocking on existing headblock cribs , including the reinstallation of salvaged components. This is the first phase (Phase 1) of a two-phase competition: the first phase will evaluate the qualifications of all bidders; the second phase (Phase 2) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Phase Two, the pre-qualification list will be terminated, no additional contracts will be awarded. Removal and disposal of four floating docks, two timber gangways, and associated mooring/anchor systems. Supply and installation of four new floating docks, two new timber gangways, and installation of new treated timber decking, wheelguards, and blocking on existing headblock cribs. Documents may be obtained from the Government of Canada Website at: https://canadabuys.canada.ca/en/tender-opportunities *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

$1,500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
33
Bidding Soon
385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Charlottetown harbour facility, Charlottetown, NL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.