BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 3, 2026 at 8:00 PM

Updated July 8, 2026

Demolition, site work and new construction of a bridge / tunnel in Seattle, Washington. Completed plans call for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

Installation of metal panels for the SR520 Portage Bay Bridge replacement project, which includes construction of new parallel variable depth segmental box girder bridges, bridge replacement, lid construction, and retaining walls. Bonds: 1% Other Bond. Set-asides: 5% SBE, 10% MBE, 6% WBE.

Sub-Bidding

$3,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
34
Bidding Soon
2,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.