BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2026 at 8:00 PM

Updated July 20, 2026

Site work for a development in Port Townsend, Washington. Conceptual plans call for site work for a development.

Jefferson County, hereafter referred to as the Agency, is seeking a multi-disciplined engineering firm to provide civil and structural engineering, surveying, geotechnical engineering, geology, hydrology and hydraulic analysis, and environmental assessments and permitting (Exhibit A) to develop a final habitat restoration design and associated permits for a portion of the Dosewallips River and floodplain (River Mile 1.0 to 2.0) upstream of the community of Brinnon, WA. The project is funded through a grant agreement between Jefferson County and the Washington State Recreation and Conservation Office (RCO) Salmon Recovery Funding Board (SRFB). The primary deliverable is a construction-ready design package including all necessary local, state, and federal permit applications to restore critical spawning and rearing habitat for Hood Canal summer chum and Puget Sound Chinook salmon. The Powerlines Preliminary Design Basis of Design Report (Exhibit B) was produced in 2024 in preparation for the final design phase. It contains flood modeling, geomorphic and habitat assessments, conceptual and preliminary designs, and more. Questions Due: Email tpokorny@co.jefferson.wa.us on or before July 8, 2026 Since 2003, Jefferson County has been working with willing landowners and partners to reduce flood risk and improve habitat for listed salmonids in the lower Dosewallips River. Currently, the County is workingprogressively towards engineered restoration designs in the Brinnon, Powerlines and Rocky Brook reaches. A final design for the Powerlines Reach will guide access, construction and related activities with the goal of improving the quality and quantity of habitat for Hood Canal Summer Chum and Puget Sound Chinook salmon. One private landowner is cooperating with the project to allow access and ground-based construction on their and adjacent properties. Additional partners include Jefferson County, Washington State Parks and the Department of Natural Resources. The design is to be accomplished in coordination with the Jamestown and Port Gamble S’Klallam Tribes, the Lower Elwha Klallam, Suquamish, and the Skokomish Tribes as well as the Hood Canal Lead Entity and the interested public through local meetings of the local Dosewallips River Collaborative and/or South County Task Force groups. Neighborhood and individual landowner meetings will also be held in support of this project.

Conceptual

$5,000,000.00

Public - County

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
108
Bidding Soon
2,621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Port Townsend, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.