Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work and paving for a mixed-use development in Port Townsend, Washington. Conceptual plans call for site work for a road / highway; water / sewer project; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.
The City of Port Townsend is soliciting proposals from firms to provide construction management services for the Lawrence Street Multimodal Improvements Project. The City of Port Townsend reserves the right to amend terms of this "Request for Proposal" (RFP) to circulate various addenda, or to withdraw the RFP at any time, regardless of how much time and effort consultants have spent on their responses. The Lawrence Street Multimodal Improvements Project will extend for approximately 1600 linear feet(six blocks) along Lawrence Street from Harrison to Walker Street. This project will reconstruct Lawrence Street, addressing both subgrade and pavement deterioration. Additionally, the project will repair sidewalks, install bike facilities and landscaping, upgrade accessibility (ADA), and fill in sidewalk gaps so as to provide a fully accessible route from Harrison to Walker Street. Water, sewer, and stormwater utility upgrades will also be completed as part of the project. The number of working days for construction will be approximately one hundred forty (140). There is no DBE or FSBE goal for this construction management agreement. Scope of Services Potential services for this construction management (CM) contract include: Constructability review of plans Bid package review Review and approval of Stormwater Pollution Prevention Plan (SWPPP) Review and approval of Temporary Erosion and Sediment Control Plan (TESC) Review and approval of Spill Prevention, Control and Countermeasures Plan (SPCC) Management of Record of Materials (ROM) Coordination of construction easements, as needed Submittal reviews, upon requestOnsite inspection throughout construction Maintain daily reports and photographic log throughout construction Collect delivery tickets and label with bid item number Document materials delivered Interpret contract documents in coordination with City and Contractor Weekly verification with Contractor on installed bid item quantities Weekly oversight of contractor's record drawings Ensure cultural resources report is followed Retain a material testing firm as a subconsultant Scheduling material testing and review of test results Retain a surveying firm as a subconsultant for construction staking Schedule construction staking activities and coordinate with Contractor Problem-solve with Contractor onsite and include City in decision-making process Coordination related to direct construction impacts, such as - but not limited to -- temporary utility shut offs, driveway access, access for businesses and residents, and access for services such as mail/garbage/transit/PUD/Lumen/Astound Coordination of Requests for Information (RFIs), Change Order Proposals (COPs), Force Accounts and Change Orders Landscape inspection, including plant counts, species confirmation, root ball and plant quality/condition Review and coordination of traffic control activities/documentation with Contractor Coordinate punch list items and keep City updated on progress Coordinate ADA Features Survey with Contractor Questions regarding this Request for Proposals may be directed to: Laura Parsons, P.E. at 360-774-3017, lparsons@cityofpt.us The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$5,000,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
September 1, 2026
Lawrence St, Port Townsend, WA
Related To This Project
Port Townsend, WA
Bid Date: Apr 02 2026
Port Townsend, WA
Bid Date: Mar 04 2026
Port Townsend, WA
Bid Date: Mar 06 2026
Port Townsend, WA
Bid Date: Feb 19 2026
Port Townsend, WA
Bid Date: Feb 27 2026
Port Townsend, WA
Bid Date: Feb 18 2026
Port Townsend, WA
--
Port Townsend, WA
Bid Date: Dec 22 2025
Port Townsend, WA
Bid Date: Nov 21 2025
Port Townsend, WA
Bid Date: Nov 19 2025
Port Townsend, WA
Bid Date: Oct 15 2025
Port Townsend, WA
Bid Date: Oct 21 2025
Port Townsend, WA
Bid Date: Oct 15 2025
Port Townsend, WA
Bid Date: Oct 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
