Published July 28, 2026 at 8:00 PM

Updated July 30, 2026

Site work and paving for a mixed-use development in Highland Park, Texas. Completed plans call for paving for a road / highway; for site work for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work generally includes the reconstruction, water, and storm improvements on Eastern Avenue (from the south side of the intersection of Eastern Avenue and Mockingbird Lane to the north side of the intersection of Eastern Avenue and Bordeaux Avenue) approximately 3,500 linear feet. The existing approximately 20 ft wide one-way single lane roadway shall be reconstructed in kind, at the same width as the existing roadway. The proposed paving will be concrete over stabilized subgrade. Intersecting street and alley paving shall be reconstructed to the nearest joint beyond the existing concrete valley gutter or approximately 5 feet of the alley entrance, respectively. The existing sidewalk shall also be reconstructed and confirmed to meet current ADA/PROWAG criteria. Additionally, there will be a small amount of 8-inch waterline replacement beginning approximately at the alley between Livingston Avenue and Southern Avenue and extending north up to approximately Mockingbird Lane (~450 LF). The two existing 3-foot long standard curb inlets at the southern end of the project limits shall be reconstructed as 5-foot long inlets. The Design will meet all current Town standards and NCTCOG/TXDOT where applicable. Question Deadline 08/06/2026 at 2:00 PM CT Bidders wanting further information, interpretation or clarification of the Contract Documents must make their requests in writing to the OWNER, specifically the Town Engineer or its designee. For additional information concerning this project, please contact Jake Bennett, P.E. with GARVER, via email at RJBennett@GarverUSA.com. The project manual states the project must be completed by June 30, 2027 and that bidders will have 270 calendar days from notice to proceed to complete the project. This puts the anticipated construction notice to proceed in October 2026, subject to change.

GC Bidding

$2,900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
472
Active Projects
163
Bidding Soon
4,387
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2026

October 12, 2026

Project location map

Eastern Ave, Highland Park, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.