BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2026 at 8:00 PM

Updated July 26, 2026

Site work, paving and new construction of a civil project in Point Reyes Station, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000431402 Roadway and utility improvements including bicycle and pedestrian facilities, storm drain installation, turn lanes, signalized intersections, sewer trunk line and manhole construction, and water distribution system installation including steel pipe, valves, and hydrants. Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond, 50% Maintenance Bond. Question Acceptance Deadline 08/13/2026 03:00 PM EDT If you have any questions, please contact Elisa Sarlatte, at 415 899-8963, or email at esarlatte@novato.gov Project Description: The Novato Boulevard Improvement project is a joint agency roadway and utility improvement project by the City of Novato, Novato Sanitary District, and North Marin Water District. The City project is a locally funded complete streets project that will provide general improvements to Novato Blvd. between Diablo Avenue and Grant Avenue including bicycle and pedestrian facilities, clean water and storm drain facilities, as well as operational improvements like turn lanes and modern signalized intersections at Novato Blvd/Diablo Avenue, Novato Blvd/7th -Tamalpais Ave., and Novato Blvd/Grant Avenue. The project does not utilize State or Federal funding. The NMWD Novato Boulevard Improvement Project includes the installation of approximately 5800 feet of 12, 8 and 6-inch distribution water distribution lines (welded steel pipe with valves, fittings, lateral branches, hydrants and appurtenances), service tap connections, service laterals and pipe disinfection. The pipe will be installed starting just East of the Novato Boulevard/Diablo intersection to just West of the Novato Boulevard/Grant Avenue intersection. The NMWD project is locally funded and will not utilize State or Federal funding.

GC Bidding

$22,300,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
101
Bidding Soon
2,764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

October 19, 2026

Project location map

Multiple Locations, Point Reyes Station, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.