BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 5, 2026

Renovation of a municipal facility in Tupper Lake, New York. Completed plans call for the renovation of a municipal facility.

Kitchen renovation services Renovate existing kitchen to include new flooring, cabinetry, and countertops 24 St. Lawrence Kitchen Renovation . The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award , unless modified below This is a NYS Public Works project, and prevailing wages are to be paid , and Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured . Upon completion of the kitchen renovation , before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or his/her representative. SCOPE OF WORK includes, but is not necessarily limited to the following: A: Demolition Removal of existing appliances. Appliances are to be stored in the house for reuse. Removal and proper disposal of existing countertops, cabinetry, backsplash tile, and flooring. 1 . 2. 3. Removal of existing light fixtures for replacement. 4. Repair, as necessary, existing walls, ceiling, and subfloor to accommodate new installations. B: New Construction 1. Provide and install new Mohawk Hot & Heavy luxury vinyl plank flooring. Floor approximately 218 sq/ft. Color to be chosen by OPWDD staff. 2. Provide and install new cabinetry. Cabinet style and manufacturer to be chosen by OPWDD staff from contractor submittals. 3. Provide and install new solid surface countertops (Pental/Quartz or equivalent). Colors/patterns to be chosen by OPWDD staff. 4. Provide and install new sinks at original locations. Installation to include new supply and drain lines. 5. Provide and install new backsplash on exterior wall. backsplash to be chosen by OPWDD staff. 6. Install new lighting fixtures (to include range hoods) and electrical outlets in existing locations. 7. Reinstall all previously removed appliances in original locations. All questions or requests for information shall be submitted , in writing to max.l.gerstenberger@opwdd.ny.gov.

Sub-Bidding

$470,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
84
Bidding Soon
1,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 12, 2026

Project location map

2445 NY-30, Tupper Lake, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.