Published July 28, 2026 at 8:00 PM

Updated August 1, 2026

Site work and new construction of a civil project in Westport, Connecticut. Completed plans call for the construction of a water / sewer project; and water / sewer project.

The work proposed under this contract is located behind 1850 Boston Post Road E in Buckley Avenue South and in front of 1790 Boston Post Road E. There are existing easements and easement restrictions in place which will impact the construction staging on 1850 Boston Post Road. The Contractor shall furnish all plant, labor, tools, equipment, and materials as required, shown on the Contract Drawings, and described in these specifications. The principal items of Work are modifications to Pump Station # 10, installation of 2,600 linear feet of C-900 force main, interconnections to the live force main and pavement removal/ repair. The work items described above do not define the entire scope of work items and equipment required to complete the sanitary sewer extension and storm sewer project. The Contractor shall be responsible to provide other associated work necessary for the completion of the contract, including but not limited to obtaining all necessary licenses and permits required to construct the facilities, construction staking, and assistance in inspections conducted by others in relation to this work. All work, materials and methods shall comply with The State of Connecticut, Department of Transportation, Standard Specifications for Roads, Bridges and Incidental Construction, Form 816 , 2004, as revised by the Supplemental Specifications dated January 2009 (otherwise referred to collectively as "ConnDOT Form 819") is hereby made part of this contract, as modified by the Special Provisions contained herein.. The State of Connecticut Department of Transportation's "Construction Contract Bidding and Award Manual" (" Manual"), August 21 , 2000 edition or latest issue, is hereby made part of this contract. If the provisions of this Manual conflict with provisions of other Department documents (not including statutes or regulations), the provisions of the Manual will govern . The Manual is available upon request from the Transportation Manager of Contracts. Replacement of force main at Pump Station 10.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,060
Active Projects
344
Bidding Soon
7,888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

August 27, 2026

Project location map

Multiple Locations, Westport, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.