BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 12, 2026

Renovation of a mixed-use development in Westerville, Ohio. Completed plans call for the renovation of a 1,444-square-foot residential development; and pre-engineered storage facility.

The WORK in accordance with the CONTRACT DOCUMENTS, dated July 29, 2026 , and any addenda thereto, includes: removal and replacement of asphalt shingle roofing and related work at the Electric Division Administration Building; removal and replacement of pre-engineered metal roofing and related work at the Electric Division Warehouse Building; removal and replacement of single- ply membrane roofing and related work at two Electric Division Substation Buildings; and specified roof repairs at the Water Division Plant Building. ENGINEER'S ESTIMATE for this PROJECT: $ 1,059,000 Summary of Work consists of the following: Refer to Drawings. 1. Electric Division Administration Building - The Work includes the following: Removal and replacement of roofing asphalt shingles, underlayment, low-slope single-ply membrane roofing, flashings and metal fascia over wood trim, and any damaged roof decking replacement as needed. Lightning protection to be removed as needed and reinstalled. 2. Electric Division Warehouse Building - The Work includes the following: Removal and replacement of pre-engineered metal roof panels, vinyl-faced batt insulation,gutters and downspouts for both the main warehouse building and connected truck dock building. Electric Division Substation Buildings - The Work includes the following: Removal and replacement of single-ply membrane roofing, flashings, coping caps and exhaust fans. Lightning protection to be removed as needed and reinstalled. Water Division Plant Building - The Work includes the following: Repairs to the vertical wall flashing to fix interior leaking at building expansion joint. Replacement of limited area built-up roofing (over interior Laboratory Space) with new insulation and ballasted single-ply roofing membrane. Install new vent duct for Owner provided dehumidifier. Question Deadline 08/20/2026 at 3:00 PM ET Online Portal Point of Contact for Written Questions: Tara Trigg Electric Utility Business Manager Electric Division Bids@westerville.org

Bid Results

$839,500.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
129
Bidding Soon
2,204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 26, 2026

Project location map

Multiple Locations, Westerville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.