BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 5, 2026

Site work and paving for a mixed-use development in Montello, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Limit - 5th Street TO CTH C The pavement needs to be replaced. Perpetuation project to replace the pavement of approximately 2.08 miles of STH 23 from 5th Street to CTH C in Marquette County. Design a replacement of the pavement, replace all curb and inlet rings including castings. Evaluate storm sewer for replacement. Replace the thin polymer overlay and/or concrete overlay of four structures with an asphalt overlay with membrane. Approaches may need to be replaced with concrete slabs. Real estate and utility coordination are anticipated.. Anticipated Construction Cost: $2,000,000-$2,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - C Montello, Main & Montello Streets *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$2,999,999.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
99
Bidding Soon
2,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2026

Project location map

E Montello St & Main St, Montello, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.