BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 3, 2026

Demolition, site work, paving and new construction of a civil project in Chicago, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 21, 2026, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required to prepare contract plans, structural designs, specifications, cost estimates, supplemental surveying, geotechnical services, lighting design, mechanical design, architectural design and any other necessary work to complete the complete removal and replacement of the existing Circle Avenue bridge to accommodate the future footprint and clearance requirements for I-290 (Eisenhower Expressway) at the Circle Avenue. The proposed scope of work for this bridge consists of the complete removal and replacement of the existing structure with a wider bridge that will accommodate pedestrian and bicycle lanes. The new bridge will be constructed as part of an advance contract while existing I-290 remains open to traffic. The scope also includes the reconstruction of the CTA headhouse and station at Circle Avenue and Harlem Avenue and will require CTA platform, railroad and track improvements that may extend out to Austin Station. A temporary connection to the existing Harlem Avenue Bridge may also be constructed as part of this project. The SOI should demonstrate experience working with railroads like CTA. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Advanced Typical) Structures (Railroad) The method of contractor selection has not been determined at this time. ILDOT - 19 - RFQ Engineering - I-290 (Eisenhower Expressway) at Circle Ave., Phase II Project

Conceptual

$94,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
241
Bidding Soon
3,985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.