BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2026 at 8:00 PM

Updated August 18, 2026

Site work for a municipal facility in Ryley, Alberta. Completed plans call for site work for a municipal facility.

Construction of the Landfill Capping and Access Road construction on the West and East slopes at the Beaver Regional Landfill, located at 50117 Range Road 173 (Secondary Highway 854), Beaver County, Alberta. The Landfill is stated approximately 2 km northeast of the Village of Ryley, Alberta and is accessed via Range Road 173 from the west side of the site. The Work will generally consist of: .1 Mobilization and demobilization of equipment to site, including construction and remediation of haul roads, site safety, and all temporary works and facilities necessary to complete the project. .2 Waste placement and compaction services, and re-grading to achieve final design waste grade prior to slope capping. .3 Exposing the existing cap structure to tie-in the proposed cap to the existing cap structure. .4 Placement and compaction of a 600 mm thick clay barrier layer, including connection and tie-in to the existing cap. .5 Placement of 290 mm thick subsoil layer. .6 Placement of 130 mm thick topsoil layer. .7 Construction of new access roads, to be completed with engineered fill (native clay material from borrow), geotextile and geogrid, 200 mm of base course aggregate, and 150 mm of surfacing aggregate. .8 Termination of the cap as designated on the drawings. .9 Installation of run-off prevention berm and erosion matting. .10 Seeding of capped areas. .11 Surveying, as required for the completion of all portions of the Work, which must include a detailed as-built geodetic survey of the entire Work area and all the Work performed including the final waste grade elevation, base of the clay barrier and top of clay barrier, base of subsoil layer and top of subsoil layer, and base of topsoil layer and top of topsoil layer. To be provided to and approved by Engineer as construction progresses. Question Deadline 08/04/2026 at 2:00 PM MT Direct questions to Kiran Bhangu via email : engineering@claystonewaste.com

Post-Bid

$250,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
34
Bidding Soon
444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

October 1, 2026

Project location map

50117 Range Rd 173, Ryley, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.