Demolition, site work and new construction of a multi-residential development in Norwalk, Connecticut. Completed plans call for the demolition of a multi-residential development; for the construction of a 77,000-square-foot, 68-unit multi-residential development; and for site work for a multi-residential development.

LaRosa Building Group is the Construction Manager for the Leroy Downs Apartment located at 79 South Main Street in Norwalk CT. This project is the new construction of 68 apartments. The project will be completed in 2 phases. Phase 1 will be the demolition of existing structures on site as well as site remediation. Phase 2 will be the remaining of the work. Phase 1 is expected to start in October of 2026 and phase 2 is expected to start in April of 2027. The scope of work consists of: Demolition and Abatement – Phase 1 Site Remediation – Phase 1 Final Cleaning Sitework Paving Fencing Landscaping Concrete Gypsum Concrete Masonry Steel and Misc Metals CLT Supply and Install – ***Already Awarded*** Finish Carpentry Air Barriers and Dam proofing Insulation Metal Siding Fiber Cement Siding Membrane Roofing Intumescent Firestopping Doors, Frames and Hardware UPVC windows Glazing Metal Stud Framing and Drywall Good Faith Efforts Cold Form Bearing Walls Metal Framing ***Already Awarded*** Acoustical Ceiling Tiles Flooring Painting Signage Accessories Appliances Cabinets and Counters Window Treatments Elevator Trash Chute and Compactor Fire Protection Plumbing HVAC Electrical Bidding Procedure and Due Date All bids must be submitted in the following manor: Email – Bids can be emailed to Vincent Parete vparete@larosabg.com Bid From – A bid form has been provided. Trades should utilize the bid form provided later in this document. Bids will be reviewed privately and leveled for accuracy. Bids are due to LaRosa Building Group by Thursday August 27th by 3PM. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set aside goals. Contracts valued over $150,000 of the State Funded Portion will be required to submit a Good Faith Effort, Short Form, Plan (GFEP). RFIS should be emailed to Vincent Parete. Section 3 Requirements All Trades should review the section 3 requirements posted to the project website. All trades are responsible for complying with section 3 requirements. “LaRosa Building Group LLC is an Affirmative Action / Equal Opportunity Employer, Small, Minority, Women, Disabled, and Section 3 Businesses are encouraged to bid” This project is Prevailing Wage. Wage rates are posted on ISQFT This project is tax exempt

Post-Bid

$27,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,056
Active Projects
415
Bidding Soon
7,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 5, 2026

Project location map

79 S Main St, Norwalk, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.