Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Site work for a playground / park / athletic field in Foster City, California. Working plans call for site work for a playground / park / athletic field.

** As of September 1st, 2026. The project was cancelled and the timeline for Rebid has not yet been established ** Expansion and resurfacing of the existing batting cage at Sea Cloud Park including selective removal of existing fencing fabric, excavation and grading, installation of approximately 60 linear feet of new concrete mow band, full removal and replacement of the synthetic turf system including base materials and tack boards, installation of new synthetic turf surfacing, installation of additional fencing fabric and posts as necessary to enclose the expanded batting cage area, and restoration of disturbed areas within the project limits. July 30, 2026. Last day to submit questions to ggotthardt@fostercity.org. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Final Planning

$125,800.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
533
Active Projects
193
Bidding Soon
3,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

March 9, 2027

Project location map

Sea Cloud Dr, Foster City, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed