BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 25, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Arran, Saskatchewan. Completed plans call for the construction of a bridge / tunnel; and for the demolition of a bridge / tunnel.

Installation of three 3,000 mm diameter polymer laminated corrugated steel pipe culverts by open excavation, including earth excavation, embankment construction, granular base course, asphalt concrete paving, random riprap, granular backfill, removal and disposal of existing culverts, and concrete headwall installation. Bonds: 5% Bid Bond.

GC Bidding

$1,450,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
6
Bidding Soon
44
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

October 12, 2026

Project location map

To Be Determined, Arran, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.