BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 3, 2026

Site work and paving for a bridge / tunnel in Moretown, Vermont. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Furnish, install, and remove an approximately 95-foot temporary one-lane bridge over the Mad River, including construction of paved approaches. SCHEDULE: The CONTRACTOR shall provide a schedule of construction and the sequence in which the CONTRACTOR proposes to carry out the work, with dates at which they will start the several salient features of the work and the contemplated dates for completing the same at the time of the preconstruction meeting. The project completion date is 11/1/2027. LOCATION OF WORK: Moretown, Lovers Lane Road, Moretown Coordinates: 44.300084N, -72.698448W DESCRIPTION/SCOPE OF WORK: The contractor will furnish, install, and remove a temporary one lane "Bailey Bridge" or equal approximately 95 feet long, 16' wide with guardrail and paved approaches (2" thick),. The temporary bridge will be constructed over the existing bridge currently used by pedestrians and non-motorized vehicles. It will extend approximately 10' beyond each end of the current bridge to allow temporary support construction. It will have HS25 load capacity. See attached documents for more details. Bridge in place schedule: 12/1/2026-10/15/2027 Question Deadline 09/08/2026 at 4:00 PM ET r.washburn@onpointconsultingvt.com

GC Bidding

$1,400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
72
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2026

December 1, 2026

Project location map

Lovers Ln, Moretown, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.