Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated September 1, 2026

Demolition and asbestos abatement for a municipal facility in Boscawen, New Hampshire. Conceptual plans call for the demolition of a 100,000-square-foot municipal facility; and for asbestos abatement for a municipal facility.

Pre-demolition hazardous building material (HBM) survey of the McLeod building, including visual inspection for suspect asbestos-containing building materials (ACBM), bulk sampling, and PLM laboratory analysis. Questions Due to the County 8/26/2026 Answers Due from the County, Addend 8/28/2026

Conceptual

$30,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
232
Bidding Soon
3,657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

September 2, 2027

Project location map

333 Daniel Webster Highway, Boscawen, NH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed