Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 24, 2026 at 8:00 PM
Updated August 25, 2026
Site work and renovation of a fitness / recreation center in Antrim, New Hampshire. Completed plans call for the renovation of a fitness / recreation center.
Question Deadline 08/25/2026 Questions must be submitted in writing not later than six (6) business days prior to the bid opening date. Removal of existing wood athletic floor, installation of new maple gymnasium flooring, and removal/reinstallation of bleachers. Scope includes concrete slab inspection, slab water vapor emission control, installation of thresholds, game standard inserts, and quoting a new bleacher system. 1.01: DESCRIPTION : Replace Wooden Gymnasium Maple Floor. Must include removal of old floor and the removal and reinstallation of bleachers (Old or New). Related Work specified in other sections: 1. Concrete slab inspection 2. Slab Water Vapor Emission Control System 3. Thresholds 4. Game Standard Inserts 5. Quote New Bleacher System 1.02: QUALITY ASSURANCE: 1. Floor System Manufacturer Qualifications: a. Manufacturers shall be an established firm experienced in the field and have been in business for a minimum of ten ( 10) years. 2. Floor Contractor/Installer Qualifications: a. Flooring Contractor shall be a firm experienced in athletic flooring field. b. Submit a list of at least three completed gymnasium projects of similar magnitude and complexity 1.03: SUBMITTALS: 1. Manufacturers Product Data a. Submit (3) Rubber Pad Specification Sheets 2. Samples: a . Submit ( 1) Sample of Rubber pad, if requested, Sample to be made by the manufacturer and so indicated. b. Submit a representative sample, equivalent to 12" x 12" of finished maple flooring. 3. Maintenance Literature: a. Submit (3) copies of "MFMA Care and Preservation of your Wood Floors" 4. Concrete Guidelines: a . Submit three (3) copies of MFMA Recommendations for correct preparation, repair and testing of existing concrete subfloor surfaces to receive replacement wood flooring. 5. Certifications: a. Suppliers shall submit certificated attesting that the materials furnished will meet specifications for grade, quality, dryness and treatment if required. 1.04: DELIVERY, STORAGE AND HANDLING: A. Delivery of Materials: 1. Materials shall not be delivered, stored, or installed until all masonry, cement inspection, removal of existing floor, bleachers, repair to any backstops, any and all overhead mechanical work to the existing HVAC and gymnasium features are confirmed complete. a . Room temperature of 55-80 degrees Fahrenheit and relative humidity of 35%- 50% are to be maintained. Ideal installation/storage conditions are the same as those that will prevail when the building is occupied. 2. In the case that the cement slab does not pass inspection for installation of new floor and requires repair, materials shall not be stored at the installation location if the moisture content of the concrete slab exceeds 4% of vapor transmission exceeds 4 pounds per 1,000 square feet.
Sub-Bidding
$450,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2026
September 30, 2026
12 School St, Antrim, NH
Related To This Project
Antrim, NH
Bid Date: Aug 12 2026
Antrim, NH
Bid Date: Aug 10 2026
Antrim, NH
Bid Date: Aug 10 2026
Antrim, NH
Bid Date: Oct 10 2025
Antrim, NH
Bid Date: Mar 10 2025
Antrim, NH
Bid Date: Apr 09 2024
Antrim, NH
Bid Date: Jun 19 2023
Littleton, NH
--
Londonderry, NH
--
Boscawen, NH
Bid Date: Sep 02 2026
Boscawen, NH
Bid Date: Sep 09 2026
Merrimack, NH
Bid Date: Aug 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
