Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2026 at 8:00 PM

Updated October 14, 2026

Site work and new construction of a water / sewer project in Gillette, Wyoming. Completed plans call for the construction of a water / sewer project.

Drilling and completion of well #1 and well #2 including pump testing, well completion, pump controls, control vault and associated improvements. Substantially complete within 150 Working Days + Final completion- 15 Working Days after Substantial Completion. Question Deadline 09/21/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. WORK requirements are summarized below. Each item is discussed in subsequent sections of the Specifications. Work for Bid Schedule B includes: Complete an open-hole geophysical survey of open borehole. Furnish and install liner-hanger-packer assembly. Mobilization to and demobilization from the WORK site. Drill for, furnish, install, and cement approximately 40 feet of 13 3/8-inch minimum diameter surface casing. Provide bonds and insurance. Drill approximately 1,620 feet of a minimum 12 1/4-inch diameter borehole. Furnish and install 8 5/8-inch O.D. (32.0 pounds/foot) steel casing in the borehole. Furnish and install cement seal. Complete cement bond log. Drill approximately 840 feet of a minimum 7 7/8-inch diameter borehole. Furnish and install 5 1 /2-inch O.D. steel casing in the borehole. Furnish and install 175 feet of 5 1/2-inch O.D. pipe size, 0.015-inch slot size, V-slot stainless steel screen. Well development and rig time. Air development. Standby time. Furnish, install, and remove a test pump and appurtenances. Conduct step-rate and constant-rate pumping tests for a combined total of approximately 54 hours. Furnish and install pitless adaptor. Furnish and install drop pipe, pump cable, airline, pressure transducer, and appurtenances. Furnish and install permanent pump and motor. Furnish and install electrical service, pump panel and controls. Furnish and install vault and equipment. Furnish and install electrical wire and conduit. Well tie in and associated work. Furnish and Install 6" Crushed Base Surfacing and associated work.

Post-Bid

$3,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
118
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

December 7, 2026

Project location map

Multiple Locations, Gillette, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed