Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 3, 2026

Site work and renovation of a mixed-use development in Murray, Iowa. Completed plans call for the renovation of a playground / park / athletic field; and playground / park / athletic field.

The Council Chambers, City Hall420 Maple St, Murray, Ia 50174, for Consideration by the City Council at Its Meeting at 6:00 Pm on December 9, 2026, in the Council Chambers at City Hall 420 Maple St, Murray, Ia 50174. The City Reserves the Right to Reject Any or All Bids, to Waive Informalities and Irregularities in the Form of the Bid, and to Enter Into Such Contract, Or Contracts, as They Shall Deem to Be in the Best Interest of the City. B. Project Description: 1. The Mallory Park and Sidewalk Improvements Project Consists of Proposed Renovations To The Existing Mallory Park, Located at 718 8th St in Murray, Iowa, to the Horse Arena Just South of the Park, and the Construction of a Concrete Pedestrian Pathway Connecting The Park to the Murray Recreation Complex on the South Side of Town. 2. All Required Site, Framing, Finishing, Plumbing, Mechanical, and Electrical Systems, As Indicated in the Contract Documents, Shall Be Included Under This Contract. 3. The Work Shall Commence Upon Issuance of the Notice to Proceed. The Notice To Proceed Will Not Be Issued Until Completion of All Applicable Post-Award Cdbg or Ieda Reviews or Authorizations and Satisfaction of the Other Preconstruction Conditions Stated In The Contract Documents, Including Approval of the Required Bonds, Acceptance Of Evidence of Insurance, and Completion of Any Required Preconstruction Conference. All Improvements Located Within Mallory Park Shall Be Substantially Complete No Later Than July 30, 2027, and the Entire Work Shall Be Substantially Complete No Later Than October 30, 2027, Unless the Contract Time Is Extended in Accordance With the Contract Documents. The Owner May Assess Liquidated Damages in the Amount of $200.00 For Each Calendar Day That the Entire Work Remains Incomplete After October 30, 2027. The Successful Bidder Will Be Required to Furnish Bonds in an Amount Equal to One-Hundred Percent (100 Percent) of the Contract Price, Said Bonds to Be Issued by a Responsible Surety Approved by the City Council and Shall Guarantee the Faithful Performance of the Contract And Terms and Conditions Therein Contained and Shall Guarantee the Prompt Payment for All Materials and Labor and Protect and Save Harmless the City From Claims and Damages of Any Kind Caused by the Operations of Contractor. Your Offer Will Be Required to Be Submitted Under a Condition of Irrevocability for a Period of 60 Days After Submission.

GC Bidding

$251,862.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
59
Bidding Soon
776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2026

January 11, 2027

Project location map

718 8th St, Murray, IA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed