Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2026 at 8:00 PM

Updated October 24, 2026

Site work and renovation of an educational facility in Lorton, Virginia. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Furnish all labor, materials, and related services required for the Roofing Replacement Project. Remove existing roofing and insulation completely to the deck and provide new roofing and insulation as per specifications and specific notes as indicated on the roof plans. Replace all flashings, roof drains , expansion and control joints, metal wall copings, wood blockings, pitch pockets, and roof hatches. Replace all existing gravel stops , fascia, gutters, splash blocks and downspouts with new as approved by Fairfax County Public Schools (FCPS) inspector. Remove all vents which are less than 8" high above roof and replace them with minimum 12" high above roof. All turbine roof vents on roof need to be saved and given to FCPS roof inspector not demoed. Clean, sand, prime and paint all exposed steel supports on designated roof areas including but not limited to RTU support frames , roof ladders and steel supports for roof screens. Abandoned pitch pockets, PRV, GV or capped off curbs shall be removed , and decking patched as required. Provide crickets between roof drains on structurally sloped roof areas, at mechanical equipment curbs and on the high side of all curbs. Submit shop drawings for approval. Provide 1 new overflow scupper per drain on wood cant locations . 10. Field verify the location and number of all power roof ventilator (PRV), gravity ventilator (GV), vent thru roof (VTR), roof drains, control joints, ladders, etc. 11. Protect existing metal wall panels from damage during reroofing project. 12. Any interior protection coverage with plastic is the responsibility of the contractor as directed by the FCPS inspector. 13. All deck flutes shall be swept clean of new and existing debris and all water blown out of flutes before installing new insulation. 14. All roof drains are to be replaced with large drain bowls and new deck pans. Question Deadline 11/04/2026 at 4:30 PM ET Any question or request for an interpretation must be in writing and submitted: (i) by mail or hand delivery addressed to Architect and Owner as indicted on the cover page to this solicitation; or (ii ) by email to Carlo Bertelli , Manager Constructin Projects by email cebertelli@fcps.edu or (703) 898-3322 or email to the Amanada Hutchison, Senior Buyer by email alhutchison@fcps.edu

Sub-Bidding

$500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
200
Bidding Soon
3,501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

June 19, 2027

Project location map

10100 Gunston Rd, Lorton, VA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed