BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 17, 2026

Site work and environmental remediation for a development in Edwards, Colorado. Working plans call for environmental remediation for a development.

No bids received. Installation of boulder channel treatment, secondary channel grade control structures, cedar post sills, wetland mats, erosion control, and channel crossing reconstruction. Bonds: Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). The project area is located in Section 11 of Township 5 South and Range 82 West in Eagle County, Colorado ( Figures 1 & 2). The work to be performed generally includes, approximately: Import, supply, and install boulders for the +- 600 LF boulder channel treatment; provide materials and installation for approximately 54 secondary channel grade control structures (cobble sills); provide materials and hand installation for +- 20 cedar post sills; provide wetland mats and erosion control; and re-construct the Phase 2 channel crossing. Per the Wetland Delineation & Pre-Construction Notification design by Birch Ecology, dated January 2026, and in accordance with Department of the Army U.S. Army Corps of Engineers NWP Verification (SPA-2026- 00045) on the unnamed tributary of Bachelor Gulch.

Final Planning

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
28
Bidding Soon
368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2026

March 11, 2027

Project location map

Multiple Locations, Edwards, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.