BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 17, 2026

Site work and new construction of a mixed-use development in Jefferson, Iowa. Completed plans call for the construction of a 34,000-square-foot municipal facility; and industrial development.

Construction of a maintenance garage building, salt structure, and cold storage structure. Bonds: Bid Bond required (unspecified amount), Certified Check required. . All questions must be directed solely to the Purchasing Agent and will not be accepted after the Q&A Submission Close Date PROJECT The project consists of site utilities, site grading and construction of a new 21,500 SF Maintenance Garage building, an exterior brine tank enclosure, 5,300 SF of metal skinned/wood pole barn salt structure, 7,200 SF of metal skinned/wood pole barn cold storage building(s) and associated paving on a vacant site owned by the Iowa DOT in Alton, Iowa. The planned MG building in Alton is expected to use similar building systems that are being used on a new MG in Jefferson, Iowa, currently under construction. Plans and Specifications for the Jefferson project are provided with this RFP to describe the DOT's current thinking about building systems planned for Alton MG. While the DOT does not anticipate any significant design changes to the shown primary building systems, we will work with the selected CMaR to explore alternative options to promote operational efficiency, improve energy efficiency, improve building life span, reduce maintenance costs, and reduce overall budget. Suggestions and value engineering opinions are to be included in services, but primary base of design is not anticipated to change.The new facility will be a single story, sprinklered building. The construction will consist of concrete foundations, slabs on grade, precast insulated load bearing wall panels and an EPDM roofing system over acoustical steel deck and supporting steel joists and girders. Heating and cooling systems and infrared radiant heat loops. A preliminary floor plan and elevations for the Alton facility are included in this package. 100% Construction Documents and Specifications for the Jefferson MG project are.included as a reference for Architectural , MEP, Civil , and Structural disciplines that will be similar to those in the Alton project. The Architectural Services team of the DOT plans for the project to be completed in a single phase. All construction must be completed and appropriated funds expended by June 30, 2029. The preliminary design and construction schedule herein shows construction being completed much sooner than that deadline. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no- 2240013090 SHIVE -HATTERY PROJECT NO: 2240013090

GC Bidding

$11,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
37
Bidding Soon
690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

September 1, 2027

Project location map

610 N Pinet St, Jefferson, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.