BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 20, 2026 at 8:00 PM

Updated September 26, 2026

Site work and environmental remediation for a development in North Hero, Vermont. Completed plans call for environmental remediation for a development.

Construction of approximately 150 feet of shoreline stabilization measures, including bioengineered soil lifts, stone toe protection, plantings, grading, and associated site restoration to address erosion and stabilize Pelots Point Road. The Engineer's Estimate for construction of this project is $85,000 to $105,000. QA date - 9-11-2026 questions about the scope of work should be emailed to Joe Bartlett at joe@feavt.com. Additional contact information provided below. Joe Bartlett Email : joe@feavt.com Office: (802) 876-7778 Cell : (802) 999-9338 The project consists of the stabilization of an eroding shoreline on Lake Champlain through the installation of encapsulated soil lifts with a stone toe. The project goal is to stabilize the erosion risk that threatens Pelots Point Road through bioengineering processes that provide additional water quality and habitat benefits on the lakeshore setting. The project is located within the Town Right of Way and on private land. The project work area is approximately 150 feet long and the bank is approximately 8 feet tall. The stone toe will be approximately 3.5 feet tall, and two to three layers of 16-inch encapsulated soil lifts will be installed above the stone. Please note that the stone toe will be set directly on bedrock and will require hammering to provide stable contact. Above soil lifts, grading will continue to meet road shoulder elevation, extending the shoulder in the most eroded areas. Approximately 27 CY of excess cut material is anticipated. The contractor shall be responsible for hauling excess fill materials off site and proper disposal . Fill shall not be within wetlands or floodplain corridors and will require prior approval to be coordinated with FEA and the Town . The contractor will be responsible for plantings within soil lifts and on slope according to the planting plan.

Post-Bid

$105,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
484
Active Projects
227
Bidding Soon
2,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

October 1, 2026

Project location map

Pelots Point Rd, North Hero, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.