Published September 20, 2026 at 8:00 PM
Updated September 26, 2026
Site work and environmental remediation for a development in North Hero, Vermont. Completed plans call for environmental remediation for a development.
Construction of approximately 150 feet of shoreline stabilization measures, including bioengineered soil lifts, stone toe protection, plantings, grading, and associated site restoration to address erosion and stabilize Pelots Point Road. The Engineer's Estimate for construction of this project is $85,000 to $105,000. QA date - 9-11-2026 questions about the scope of work should be emailed to Joe Bartlett at joe@feavt.com. Additional contact information provided below. Joe Bartlett Email : joe@feavt.com Office: (802) 876-7778 Cell : (802) 999-9338 The project consists of the stabilization of an eroding shoreline on Lake Champlain through the installation of encapsulated soil lifts with a stone toe. The project goal is to stabilize the erosion risk that threatens Pelots Point Road through bioengineering processes that provide additional water quality and habitat benefits on the lakeshore setting. The project is located within the Town Right of Way and on private land. The project work area is approximately 150 feet long and the bank is approximately 8 feet tall. The stone toe will be approximately 3.5 feet tall, and two to three layers of 16-inch encapsulated soil lifts will be installed above the stone. Please note that the stone toe will be set directly on bedrock and will require hammering to provide stable contact. Above soil lifts, grading will continue to meet road shoulder elevation, extending the shoulder in the most eroded areas. Approximately 27 CY of excess cut material is anticipated. The contractor shall be responsible for hauling excess fill materials off site and proper disposal . Fill shall not be within wetlands or floodplain corridors and will require prior approval to be coordinated with FEA and the Town . The contractor will be responsible for plantings within soil lifts and on slope according to the planting plan.
Post-Bid
$105,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2026
October 1, 2026
Pelots Point Rd, North Hero, VT
Related To This Project
North Hero, VT
Bid Date: Feb 26 2026
North Hero, VT
Bid Date: Jan 13 2026
North Hero, VT
Bid Date: Nov 25 2025
North Hero, VT
Bid Date: May 15 2025
North Hero, VT
--
North Hero, VT
Bid Date: Dec 10 2024
North Hero, VT
Bid Date: Sep 12 2024
North Hero, VT
Bid Date: May 07 2024
Orange, VT
Bid Date: Sep 17 2026
Weathersfield, VT
--
Westminster, VT
--
Bennington, VT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.