Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 4, 2026 at 8:00 PM
Updated September 9, 2026
Renovation of a municipal facility in Saint Marys, Georgia. Completed plans call for the renovation of a municipal facility.
Work to be done: The work shall include the renovation and construction of a womens bathroom for the Coast Guard facility . The work shall include general construction, as well as electrical, plumbing, finishes, and fire protection improvements for the facility. The Contractor shall provide the necessary labor, equipment, materials, and any other items and/or appurtenances required for a successful and complete project. Contract time shall be 120 consecutive calendar days from the date of a Formal Notice to Proceed from the City of St. Marys. Questions regarding this project may be directed in writing to the City of St. Marys Public Works Engineer, Chris Amos, at 418 Osborne Street, St. Marys, Georgia, 31558 or email at camos@stmarysga.gov. Please keep all questions in a written or electronic format. SCOPE OF WORK 1) The Contractor shall convert an existing men's toilet to a women's combination toilet & shower and carve out an area of the men's locker room to create a women's locker room. 2) The Contractor shall evaluate existing plumbing in the new women's bath to determine routing of newly created shower drains. 3) The Contractor shall cut and remove slab to accommodate for recess for shower base to slope to drain with tile finish. 4) The Contractor shall evaluate the adjacent toilet area and calculate, remove and/or replace tile accordingly. 5) The Contractor shall provide and install all finishes , including tile (floor, wall, and ceiling), gypsum board, primer, paint, and sealer, as described in the project site plans. 6) The Contractor shall remove and/or relocate existing lockers, benches , or other fixtures according to the project site plans. 7) The Contractor shall reuse existing lights and install and/or remove door frames , walls , fixtures, vanities, and other appurtenances as specified in the provided project site plans. 8) The Contractor shall adjust drop ceiling and add or remove light switches as needed, according to the floor, reflected ceiling, and electrical plans included in the bid documents. 9) The Contractor shall adjust, relocate, and/or add new sprinkler heads, smoke detectors, strobes, and emergency lights as required for 100% coverage, as specified on the reflected ceiling plan included in the bid documents. 10) The Contractor shall adjust, relocate, and/or add new exhaust fans, air supply and return vents as required for full coverage heating, cooling, and ventilation. 11 ) The Contractor shall provide, as indicated on the water supply and sanitary sewer plans included in the bid documents, all plumbing work, including fixtures, trim, accessories, and incidentals, as required for complete sanitary waste, vent, cold water, and hot water systems. 12) The Contractor shall connect all plumbing systems to site services and test for proper operation
GC Bidding
$100,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2026
November 5, 2026
563 Point Peter Rd, Saint Marys, GA
Related To This Project
Saint Marys, GA
Bid Date: Sep 10 2026
Saint Marys, GA
Bid Date: May 20 2026
Saint Marys, GA
--
Saint Marys, GA
--
Saint Marys, GA
Bid Date: Mar 26 2026
Saint Marys, GA
Bid Date: Mar 24 2026
Saint Marys, GA
Bid Date: Mar 31 2026
Saint Marys, GA
Bid Date: Feb 10 2026
Saint Marys, GA
Bid Date: Feb 17 2026
Saint Marys, GA
Bid Date: Jan 30 2026
Saint Marys, GA
Bid Date: Nov 21 2025
Saint Marys, GA
Bid Date: Nov 12 2025
Saint Marys, GA
Bid Date: Oct 30 2025
Saint Marys, GA
Bid Date: Oct 30 2025
Saint Marys, GA
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
