Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 13, 2026 at 8:00 PM
Updated October 21, 2026
Demolition, site work and renovation of an educational facility in Northfield, Illinois. Completed plans call for the renovation of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
The New Trier Township High School District 203 Board of Education is accepting bids only from mechanical contractors for a mechanical renovation project at their freshmen campus in Northfield, Illinois . The mechanical contractor will act as the project general contractor and responsible for all work . Bids will not be accepted from firms other than mechanical contractors . The general scope of work is a renovation of the existing mechanical systems serving the Cornog Auditorium and related spaces in Building E at the New Trier High School's Northfield Campus . The general scope of work includes providing all labor, materials , machinery, tools , equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following : temporary facilities and controls, cutting and patching existing construction and finishes, general commissioning , selective demolition, miscellaneous cast-in-place concrete, cutting & patching existing roof systems and flashings, penetration firestopping, joint sealants, acoustical panel ceilings, interior painting, fire- suppression sprinkler systems , plumbing , heating, ventilating and air-conditioning ( HVAC ) , commissioning of HVAC , instrumentation and control devices for HVAC, direct-digital controls system for HVAC , hydronic piping, hydronic specialties , HVAC pipe and duct insulation, hydronic pumps , HVAC water treatment, air duct accessories, air- handling units , welding, terminal heating and cooling units, electrical power, switchboards , panelboards , wiring devices, enclosed switches , surge protection devices , interior lighting, lighting controls , extension/modification of existing fire alarm system , and all other labor, materials, and accessories required for a complete and proper installation. The work site is located in Building E at New Trier High School , Northfield Campus, 7 Happ Road , Northfield, IL 60093. Onsite construction will commence approximately on Monday , June 7 , 2027 or sooner, dependent on actual school snow days and school events . The Contractor must achieve Substantial Completion for all work on or before Friday, August 13 , 2027. Liquidated damages apply to the Substantial Completion date . Required prequalification documentation must be submitted in Adobe PDF format to Steve Cashman, at the Cashman Stahler Group, email address scashman@cashmanstahler.com, on or before 4:00 p.m. local time, Tuesday, September 29 , 2026. A Bidder's failure to submit the required prequalification documentation may be considered grounds for rejection of the Contractor's bid. Each bid must be accompanied by a bid security in the amount of ten percent ( 10 % ) of the Base Bid . The successful bidder will be required to furnish construction performance and labor and material payment bonds in the full amount of the Contract Sum . Contractor shall not pay less than the prevailing rates of wages to all laborers , workmen , and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act ( 820 ILCS 130 /1-12 ) . The Contractor will be required to submit electronic copies of their certified payrolls with each application for payment using the Illinois Department of Labor's Prevailing Wage Portal . The New Trier Township High School District 203 Board of Education reserves the right to accept or reject any or all bids , reject nonconforming bids , reject conditional bids , waive irregularities in the bidding procedures , or to accept any bid that, in its sole opinion, best serves the interests of the School District.
Post-Bid
$500,000.00
Public - County
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2026
June 7, 2027
7 N Happ Rd, Northfield, IL
Related To This Project
Northfield, IL
Bid Date: Sep 22 2026
Northfield, IL
Bid Date: Oct 14 2026
Northfield, IL
--
Northfield, IL
Bid Date: Dec 04 2026
Northfield, IL
Bid Date: Aug 25 2026
Northfield, IL
Bid Date: Nov 30 2026
Northfield, IL
Bid Date: Jul 20 2026
Northfield, IL
Bid Date: Jul 20 2026
Northfield, IL
--
Northfield, IL
--
Northfield, IL
--
Northfield, IL
Bid Date: May 08 2026
Northfield, IL
Bid Date: May 11 2026
Northfield, IL
Bid Date: Mar 12 2026
Northfield, IL
Bid Date: Dec 04 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed