Site work and paving for a mixed-use development in Sandwich, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Construct and pave an approximately 39,960 sq ft parking area including site preparation, excavation, and grading; concrete curbing; asphalt paving; and striping and signage. The 102d Civil Engineer Squadron (102 CES) is seeking competitive proposals from qualified civil contractors to construct a new asphalt parking lot complete with perimeter concrete curbing, stall markings, and ADA-compliant parking spaces adjacent to the base running track. This project requires a durable, heavy-duty pavement design to accommodate recreational vehicles, light-duty trucks, and occasional maintenance vehicles. All pavement profiles must support standard parking and low-speed turning loads without rutting. Workforce participation goals are 6.9% for women and 15.3% for minorities. The estimated contract value is $400,000.00. Site Visit note- Contractors are requested to arrive at the Bourne Connery Gate no later than 9:15am. The site visit will last roughly 30-45 mins. Attendees must be REAL ID compliant. Contractors with questions can submit them via email to the contracting officer Michaela Kochka at michaela.a.kochka@mass.gov. Questions are due by September 18, 2026 at 10:00am. Note * Only electronic quotes submitted via COMMBUYS will be accepted in response to this ITB. Responses must be sent via the "Create Quote" functionality in COMMBUYS. Phase I: Site Preparation & Earthwork 1. Clearing & Grubbing: Excavate and clear the designated site footprint of all organic matter, topsoil , and vegetation. Stockpile reusable soil in pre-approved base locations or haul off-base. 2. Subgrade Preparation: Grade, level, and compact the subgrade to a minimum of 95% Modified Proctor density. Ensure the grade exhibits a 1.5% to 2.0% slope directing runoff toward perimeter drainage channels or catch basins. 3. Base Course: Install, level, and compact a 4.0- inch thick layer of dense-graded crushed stone aggregate base. 2.2 Phase II: Concrete Curbing Installation 1. Curb Specification: Install approximately 850 linear feet of precast or cast-in-place MassDOT Type A vertical concrete curbing along the perimeter of the parking lot. 2. Joints & Foundations: Secure curbs on a poured concrete foundation block with structural joints, expansion joint fillers, and appropriate backfill compaction to prevent shifting or cracking from vehicle impact or freeze-thaw cycles. 2.3 Phase III: Asphalt Concrete Paving (Heavy Loading Spec) The parking lot pavement structure must be installed in two distinct, high - durability lifts: 1. Tack Coat: Apply an emulsified asphalt tack coat to the compacted aggregate base. 2. Binder Course: Lay and compact a 2.0-inch thick (finished depth) Asphalt Binder Course (nominal maximum aggregate size of 19 mm or Mass DOT equivalent). 3. Surface/Wearing Course: Lay and compact a 2.0-inch thick (finished depth) Asphalt Surface/Wearing Course ( nominal maximum aggregate size of 12.5 mm or MassDOT equivalent), resulting in a total compacted asphalt thickness of 4.0 inches. 2.4 Phase IV: Marking, Striping, and Signage 1. Layout & Curing: Allow asphalt to cure for 7 to 14 days. Lay out approximately 100 parking stalls. 2. Painting Specifications: Apply two coats of high-durability, fast-drying acrylic waterborne traffic paint: Approximately 94 standard stalls painted with 4-inch wide white reflective lines. 6 ADA-compliant stalls painted with blue lines and international access symbols. 3. ADA Signage: Supply and install 6 heavy-duty steel U- channel posts with reflective, federal-compliant R7-8 " Reserved Parking" signs at the head of each ADA-compliant stall.
GC Bidding
$400,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2026
September 30, 2026
Multiple Locations, Sandwich, MA
Related To This Project
Sandwich, MA
Bid Date: Sep 23 2026
Sandwich, MA
Bid Date: Sep 23 2026
Sandwich, MA
--
Sandwich, MA
Bid Date: Sep 17 2026
Sandwich, MA
Bid Date: Sep 02 2026
Sandwich, MA
Bid Date: Sep 09 2026
Sandwich, MA
Bid Date: Aug 26 2026
Sandwich, MA
Bid Date: Aug 18 2026
Sandwich, MA
Bid Date: Aug 11 2026
Sandwich, MA
Bid Date: Aug 07 2026
Sandwich, MA
Bid Date: Aug 14 2026
Sandwich, MA
Bid Date: Aug 28 2026
Sandwich, MA
Bid Date: Sep 01 2026
Sandwich, MA
Bid Date: Aug 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.