Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 29, 2026

Site work and renovation of a mixed-use development in Tremonton, Utah. Completed plans call for the renovation of a military facility; and for site work for a military facility.

Remediation of entrance doors to comply with 2010 ADA Standards including clear width, threshold, hardware, and signage. The Contractor shall provide all labor, materials, equipment, tools, transportation, supervision, and incidentals required to perform entrance modifications ensuring ADAcompliance. Work includes assessment, design , procurement, installation, testing, verification, and documentation. The Contractor shall remove existing components and install all new compliant assemblies. Project Location - USDA Tremonton Field Office (located at 1950 W. Main in Tremonton, Utah) ADA door clear width minimum 32 inches at 90 degrees. Threshold height <=1/2 inch (beveled if over 1/4 inch). Maneuvering clearance minimum 30x48 inches as applicable. Lever/push hardware operable without tight grasping, mounted 34-48 inches AFF. Door closing speed minimum 5 seconds from 90 to 12. Automatic doors must comply with ANSI A156.10/156.19 with proper sensor coverage. Tactile/Braille signage mounted 48-60 inches AFF, high contrast, non-glare. Q/A:- Any and all questions MUST be in writing and submitted to Marilyn MacTaggart, at marilyn.mactaggart@usda.gov no later than Friday September 18, 2026, 12:00pm EST. Period of Performance - 8 weeks

Post-Bid

$1,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
41
Bidding Soon
860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

October 22, 2026

Project location map

1950 W Main St, Tremonton, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed