Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2026 at 8:00 PM

Updated October 24, 2026

Site work for a bridge / tunnel in Cambridge, Ohio. Completed plans call for site work for a bridge / tunnel.

This contract includes all described work to be performed at one project site (GUE-177-14.87). The Bidder will present a complete bid proposal to fully install an owner-supplied liner pipe inside the existing structure at SFN 3003302_Bridge Number GUE-177-14.87 as per SS837 and all applicable portions of this contract, except as otherwise described below. The Bidder's entire bid will be presented on the provided ITB 365-27 Pricing Sheet. Any necessary items and/or quantities not included in the ITB 365-27 Pricing Sheet will be considered as incidental to the Bidder's pricing proposal. Prior to bid, the Bidder will review the existing construction site at SFN 3003302_Bridge Number GUE-177-14.87 to determine what portions of the temporary works can be utilized to continue this installation project. The existing 60" side conduit casing running parallel to SFN 3003302 andpositioned just north of SFN 3003302 may be utilized for water control during this project. Additional temporary flow capacity may be provided by temporary pumping systems aligned underneath the I.R.-77 bridges (SFN's 3003272 & 3003248) to the outlet area of culvert CFN 1824268 (72" diameter). All costs to utilize, modify, supplement, resupply, rebuild , and subsequently remove temporary works after the proposed liner is installed will be included within the Bidder's pricing proposal . The Bidder will utilize all supplied and staged segments of 142" I.D. / 144" O.D. ODOT C&MS 707.18 Smooth-Cor conduit and all associated hardware necessary to install the liner pipe. This material is staged at the project site for installation with this contract. Prior to bid , the Bidder will review the supplied conduit and all associated hardware at SFN 3003302_Bridge Number GUE177-14.87 to determine whether any portions of the supplied material need resupplied to complete this installation project. All costs to prepare the site for installation, remove or modify temporary rigging/falsework, and utilize, resupply, install , etc. the liner conduit will be included within the Bidder's pricing proposal. The requirement contained in Supplemental Specification 837 to submit the installation plan 15 days prior to installation is reduced to 4 days for this project. Question Deadline 10/15/2026 at 1:00 PM ET Bidders with questions are encouraged to submit an inquiry in OhioBuys

Post-Bid

$450,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
119
Bidding Soon
2,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

November 20, 2026

Project location map

I-77, Cambridge, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed