Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 5, 2026 at 8:00 PM
Updated October 7, 2026
Site work and paving for a civil project in Long Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
(3.27-Mile) Roadway Reconstruction, Widening and Realigned project consists of replacement traffic signal, new signalized intersection, retaining Walls, seven major crossings, a closed drainage system, controlled stiffness column ground improvement, temporary retaining walls. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove Lake County. Key Route(s) FAP 337 Section(s) 20-Y PPS #(s) -71354-0100, 1-71354-1000, 1-71354-2000 Questions not accepted as of October 27, 2026 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 16, 2026. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. IL DOT - Roadway Reconstruction, Widening and Realigned project
GC Bidding
$2,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2026
January 5, 2027
IL-22, Long Grove, IL
Related To This Project
Long Grove, IL
--
Long Grove, IL
Bid Date: Aug 13 2026
Long Grove, IL
Bid Date: Apr 30 2026
Long Grove, IL
Bid Date: Apr 30 2026
Long Grove, IL
Bid Date: Nov 18 2025
Long Grove, IL
Bid Date: Sep 19 2025
Long Grove, IL
Bid Date: Aug 14 2025
Long Grove, IL
Bid Date: Jul 09 2025
Long Grove, IL
Bid Date: Jan 08 2025
Long Grove, IL
Bid Date: Sep 27 2024
Long Grove, IL
--
Long Grove, IL
Bid Date: May 09 2024
Long Grove, IL
Bid Date: Apr 11 2024
Long Grove, IL
Bid Date: Jan 22 2024
Long Grove, IL
Bid Date: Apr 07 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed