Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2026 at 8:00 PM

Updated October 24, 2026

Renovation of a day care center in Siletz, Oregon. Completed plans call for the renovation of a day care center.

The Confederated Tribes of Siletz Indians ("CTSI") is seeking proposals from qualified vendors to assist with repainting the exterior of the main building and replacing the gutters for main building. This includes PAINTING and Install fo new gutters. Submitter may direct questions regarding this RFP to: Tenas Illahee Child Care Center Attn: DeAnn Brown, Head Start Director P.O. Box 549 930 W. Buford Avenue Siletz, OR 97380 Phone: (541) 444-2450 Email: deannb@ctsi.nsn.us Within 60 days after the acceptance of the proposal, and contract execution. None scheduled. Please contact Deann Brown at deannb@ctsi.nsn.us to schedule viewing the property in question for repairs. Siletz Head Start Building and Shed Repairs Painting of exterior main building. Pressure wash main building. Remove and replace damaged or rotten T- 111 siding and replace with Hardi trim and z flashing where required. Repair any caulking at seams or joints where sealant has begun to fail. Repaint entire main building with top quality Sherwin Williams paint. 1 body color, 1 trim color, 1 color for basket weave design in concrete wall. Prime and paint 7 metal posts (2 at front entrance, 1 at each of the side entry doors, 3 at the back of the main building). Remove and dispose of all debris and the job site should be left clean and free of debris for safe use of property by CTSI Staff, children being cared for and their parents. Installation of new gutters. Remove and dispose of old gutters. Replace damaged or rotten facia boards. Replace gutters with painted one-piece aluminum gutters and downspouts. All gutters and down spouts will be firmly attached to building per state and local government building codes, with a minimum of gaps between roof and gutter. Gutters shall not leak at miters, corners, or joints. All gutters shall be installed with the correct slope for drainage. Water shall not stand in gutters more than ½ inch in any area. All downspouts shall be firmly attached to the building with adequate straps to ensure no bows or gaps between wall and downspout. Downspouts shall be located approximately every 30 feet or as required by roof design. Downspouts will not terminate in such a manner as to cause water flow problems or drainage issues on the property. Downspouts shall be continuous as much as possible with a minimum of piecing and joining. Splashguards shall be installed as necessary. Splashguards shall be installed at all valleys . Splashguards shall be installed at each downspout. All debris shall be removed and disposed of and the job site shall be left clean and free of debris.

GC Bidding

$80,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
60
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2026

November 27, 2026

Project location map

930 W Buford Ave, Siletz, OR


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed