Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 21, 2026

Site work and new construction of a pre-engineered storage facility in Fultonville, New York. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Electrical will consist of furnishing all materials, equipment and labor necessary for the construction of a new salt storage facility including but not limited to wiring, conduits, switches, lighting, hangers and supports, grounding and bonding, and identification, all as defined in greater detail in the contract documents. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Women and Minority Owned Businesses are encouraged to apply. Section 3 Businesses are encouraged to apply If a Bid is sent by mail or other delivery system, both the outside packaging and sealed envelope containing the bid within shall be clearly marked "Town of Glen Salt Storage Facility, Contract No. _ Bid Enclosed". Accompanying each bid must be a bid bond or certified check made payable to the order of the Town of Glen in the amount of five (5%) percent of the bidder's maximum bid amount as a guarantee that if the contract is awarded to a bidder, said successful bidder will comply with the Notice to Bidders and the specification for the contract in accordance therewith. Said bid bond or certified check will be retained by the Town of Glen, and upon completion of the contract, in accordance with said specifications, the said bid bond or certified check will be returned to the bidder. On failure to comply with the requirements in this document and the specifications for said contract, the successful bidder shall forfeit the deposit as liquidated damages to the Town of Glen. Every bid or proposal must contain a non-collusion affidavit executed by the bidder or his authorized representative. Separate Performance and Payment Bonds, each equal to one hundred (100%) percent of the contract sum, will be required of the successful bidder. The bidder to whom the contract will be awarded shall execute the contract and furnish required sureties within ten (10) days after the date of Notice of Award. Failure to do so will result in Bidder's forfeit of contract work and bid security. No bidder may withdraw their bid within sixty (60) days after the date set for the opening thereof. Any bid may be withdrawn prior to the above scheduled time for the opening of bids, or any authorized postponement thereof. The Town of Glen and their representative will not offer or supply anyone the list of people that have obtained a copy of these bid specifications or cost estimates for the project prior to the opening of the bids. NO EXCEPTIONS ARE MADE TO THIS POLICY. The Town of Glen reserves the right to waive any informalities in or to reject any or all bids submitted or to award the contract to the lowest responsible bidder who in the Town's judgment makes the most advantageous proposals to the Town of Glen . Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email jtrzeciak@primeeng.com with any questions. Questions received less than seven days prior to the date for opening of Bids may not be answered. Questions Deadline : Oct 8, 2026

Post-Bid

$200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
125
Bidding Soon
1,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

November 16, 2026

Project location map

3950 County Hwy 30A, Fultonville, NY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed