Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 12, 2026

Site work and paving for a road / highway in Barre, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of this Contract consists of furnishing all materials and labor necessary for the completion of the Work as specified herein . Road resurfacing work may consist of improvements to roadways including but not limited to, the milling and disposal of bituminous concrete pavement; modification to drainage structures; installation of new catch basins, frames and covers; placement of hot mix asphalt (HMA) and removal and installation of new bituminous HMA berm ; removal and installation of new granite curbing; removal and installation of ADA compliant sidewalk ramps; and installation of signage and road markings. The work contained in this bid consists of reclaiming approximately 16,000 square yards of roadway, placement of approximately 4,460 tons of hot mix asphalt, 25 tons of hot mix asphalt driveway aprons, 500 linear feet of straw wattle, and related work. All HMA work and materials shall follow Mass DOT Standard Specifications 2026 or current edition section 460 HMA for local streets, 470 HMA berm , 403 for FDR or applicable section for work or materials furnished and placed. Question Deadline 10/29/2026 Questions regarding the necessary pavement-resurfacing and related work may be directed to the DPW Superintendent, Timothy Batchelor, by emailing dpwsuperintendent@townofbarre.com. To receive consideration, such questions shall be submitted in writing to the Town at least 7 days before the established date for receipt of bids.

Post-Bid

$631,475.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
877
Active Projects
345
Bidding Soon
5,906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

December 7, 2026

Project location map

Cutler Rd, Barre, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed