Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2026 at 8:00 PM

Updated November 23, 2026

Demolition, site work and asbestos abatement for a municipal facility in Greenfield, Wisconsin. Completed plans call for asbestos abatement for a municipal facility; and for the demolition of a municipal facility.

Project includes abatement and disposal of asbestos-containing and regulated materials, demolition of a two-story building with basement and detached garage including foundations and slabs, backfilling, grading, and site restoration. Requires coordination of utility disconnections and erosion control. The City contact regarding this solicitation is Kent Perleberg, Building & Facilities Manager, (414) 329- 5314, Kent.Perleberg@greenfieldwi.gov. Project Scope The following outlines the required work. Contractors shall review the attached October 2026 revised asbestos report and June 2026 lead-based paint and hazardous materials report prepared by The Sigma O Group, Inc. (Sigma), Project No. 25257, field-verify conditions and quantities, and provide a complete proposal covering labor, equipment, supervision, permits, protection, transportation , disposal, general conditions, and fees, except where expressly excluded. Abatement and Selective Demolition Provide all required notifications, permits, containment, protection, monitoring , certified personnel, and lawful handling, transportation, and disposal for regulated materials identified in Sigma's pre-demolition assessments. Remove asbestos-containing exterior white seam caulk (MC-3); asbestos-containing floor tile, linoleum, and associated mastics (MF9-1 , MF9-2, MF9-3, MF9-5, MF9-6, MF12-2, and MFL-2 as identified in the revised report); and affected subfloor materials necessary to complete removal. Remove and properly dispose of transite siding (TS- 1 ) and materials assumed to contain asbestos, including electrical panels (MEP-1 ) and toilet wax ring (MTWR-1 ). Address identified lead-based paint on the exterior wood soffit and lead-bearing coatings using compliant demolition, worker protection, handling , and disposal practices. Remove and properly manage other identified hazardous or special-handling items, including refrigerantcontaining equipment, potentially mercury-containing lamps or devices , potential PCB/oil-containing components, and potentially radioactive smoke detectors, as applicable to actual site conditions. Complete all required abatement, regulated-material removal, and clearance/documentation before the City Fire Department conducts training or any mass demolition begins. Furnish disposal manifests and applicable closeout records to the City. Field-verify all materials and quantities . Immediately stop affected work and notify the City upon discovery of previously unidentified suspect regulated materials; obtain written direction before proceeding with additional work. Reference quantities from Sigma's asbestos summary include approximately 80 linear feet of caulk, 725 square feet of identified flooring/mastic, 3,040 square feet of transite siding, two electrical panels, and one toilet wax ring. These are preliminary report quantities, not guaranteed bid quantities. MF9-4 (green floor tile and mastic) is classified NEG in Sigma's October 2026 revised report and is excluded from the asbestos-containing flooring quantity

GC Bidding

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
192
Bidding Soon
3,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

December 30, 2026

Project location map

4510 W Loomis Rd, Greenfield, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed