Site work and new construction of a playground / park / athletic field in Greenfield, Wisconsin. Completed plans call for the construction of a playground / park / athletic field.

The Turf Skatepark Shelter project involves the construction of a new park shelter that includes two restrooms, a storage room, a canteen, and an open pavilion. The structure will feature CMU walls, wood trusses, and a concrete slab on grade. The mechanical, electrical, and plumbing systems are fully engineered. The project scope covers categories such as water utilities, plumbing, heating, ventilation, air conditioning, concrete formed flatwork foundation, roofing, siding installation and repair, excavation, electrical work, sitework excavating and grading, masonry construction and restoration, miscellaneous work, and landscaping. Bidders are instructed that there is a non-mandatory pre-bid walk through on site. Digital plan documents can be downloaded through Quest or obtained from Moore Construction Services. Contract Number Contract Description #1 Concrete #2 Masonry #3 General Trades / Carpentry #4 Roofing #5 Siding #6 Plumbing #7 HVAC #8 Electrical #9 Earthwork #10 Site Utilities #11 Landscaping Contact the Construction Manager, Moore Construction Services Kathryn Sullivan at (414) 477-3662 with any questions. Bidders requiring clarification or interpretation of the Bid Documents shall make a request to Moore Construction by February 12, 2026 @ 1:00PM. CONTRACT #1 - CONCRETE (Generally Covered by Specification Sections on C-900, S-003 & S-601) Work Included, But Not Limited To: All Labor Materials and Erection Footings/Foundations/Pads/Piers Interior & exterior slab on grade Thickened slabs at interior, non-load bearing CMU walls Sidewalks Concrete reinforcing Thermal insulation Underslab vapor retarder Joint filler Sealed concrete floor except at epoxy flooring locations Concrete joints to be sawed; tooled joints are not acceptable Fine grading aggregate base (furnished & installed by others)CONTRACT #2 - MASONRY (Generally Covered by Specifications on A-101, S-003 & S-601) Work Included, But Not Limited To: All Labor Materials and Erection Burnished concrete block per plans and specifications. Includes 8" half course solid banding block with convex face Includes anti-graffiti coating per plans; anti-graffiti coating shall be compatible with water repellent additive. Glass block windows; includes (2) middle courses of custom color "Tangerine" glass block. All necessary wall flashings in masonry assemblies Masonry lintels / bond beams Masonry piers per plans Installation of hollow metal door frames in masonry openings Installation of 5/16" bent plates provided by others (reference detail C5/S-501) Furnish and install water repellent additive per plans (reference note on A-201) Caulking masonry control joints Includes (2) mobilizations Not Included: Fluid Applied Vapor Barrier Custom Bid Result #1 CONCRETE Edgar J Praeger - $ 62,324.00 #2 MASONRY Paun Construction - $ 120,470.00 #3 GENERAL TRADES / CARPENTRY Level Up Construction - $ 147,180.00 #4 ROOFING SRS Roofing - $ 31,000.00 #5 SIDING SRS Roofing & Sheetmetal - $ 61,000.00 #6 PLUMBING Southport Engineered Systems, LLC - $ 47,064.00 #7 HVAC Southport Engineered Systems, LLC - $ 15,823.00 #8 ELECTRICAL Dnesco - $ 59,616.00 #9 EARTHWORK D&L Grading - $ 23,700.00

Bid Results

Playgrounds / Parks / Athletic Fields

$568,177.00

Public - City

New Construction, Site Work

43

3

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

April 27, 2026

Project location map

4267 W Loomis Rd, Greenfield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.